Question 1 1-A decision-making process generally relies on:
Correct
Mark 1.00 out Select one:
of 1.00
a.Evaluator, variables and alternatives.
b. Analyst, variables of the company and external variables.
c. Analyst, variables of the company, external variables and alternative options.
d. Evaluator, internal variables, external variables and other options or alternative projects.
The correct answer is: Evaluator, internal variables, external variables and other options or alternative projects.
Question 2 2- Before choosing any investment project, it is essential to previously determine some basic
Correct
Mark 1.00 out variables, which are: Select one:
of 1.00
a.Time horizon and initial investment to be made.
b. Expected cash flows and rate of return.
c. All of the above.
d. Residual values of the investment and return on investment.
The correct answer is: All of the above.
Question 3 3- What are the temporary factors that have to be taken into account in the time horizon of an
Correct
Mark 1.00 out investment? Select one:
of 1.00
a.Useful life and business life.
b. Useful life, life of the assets, business life and technological life.
c. Useful life, business life, technological life and estimation of the shareholders.
d. Useful life, business life, technological life and estimation of experts.
The correct answer is: Useful life, business life, technological life and estimation of experts.
https://campus.eneb.com/login/proteccio.php? 1/
user=1919 6
, 9/16/21, 11:45 Module 6: Selection and Hierarchical Evaluation of Simple Investment Projects: NPV and IRR File Edit titleMove right:
AM Attempt review
Question 4 4- What is the determination of the investment?
Correct
Mark 1.00 out Select one:
of 1.00
a.The establishment of the funding requirements that the investment project will need throughout its life.
b. The scope of action of the tax agency.
c. Customer.
d. Supplier.
The correct answer is: The establishment of the funding requirements that the investment project will need
throughout its life.
Question 5 5- How can the invested funds be broken
Correct
Mark 1.00 out down? Select one:
of 1.00
a.Fixed assets and cash flow.
b. Fixed assets and working capital.
c. Variable assets and working capital.
d. Variable assets and cash flow.
The correct answer is: Fixed assets and working capital.
Question 6 6- What is the difference between the components of the
Correct
Mark 1.00 out
invested funds? Select one:
of 1.00
a.One remains the same throughout the analysis horizon and the other gains value over time.
b. One remains variable throughout the analysis horizon and the other loses value over time.
c. They hardly have any difference.
d. One remains the same throughout the analysis horizon, and the other can lose or gain value over time.
The correct answer is: One remains the same throughout the analysis horizon, and the other can lose or
gain value over time.
Question 7 7- What are the residual values of the
Correct
Mark 1.00 out investment? Select one:
of 1.00
a.The residual value cash flows remaining at the end of the period of analysis.
b. The disposal values of the remaining assets at the end of the analysis period.
c. None of the above.
d. Cash flows that consist of the residual or disposal value of the remaining assets at the end of the analysis
period.
The correct answer is: Cash flows that consist of the residual or disposal value of the remaining assets at
the end of the analysis period.
https://campus.eneb.com/login/proteccio.php? 2/