Under what conditions is the minimum remaining runtime hours at maximum capacity
before a unit considered Resource Limited? - Answers - 72

For Price Based Units, which price schedule must exist and be marked as available? -
Answers - Price 79

What term is used to describe reserve MWs that are attainable between 10 minutes and
30 minutes of a request? - Answers - Secondary Reserves

How much notice must a generator give to PJM before coming online? - Answers - 20
minutes

What field is selected to calculate the schedule's offer when dispatched between MW
segments? - Answers - Use Offer Slope

At a minimum, PJM will request an IRC prior to which of the following daily
occurrences? - Answers - The peak load

Name the two Regulation types - Answers - Reg A and Reg D

Which of the following would most likely result in high voltages? Check all that apply: -
Answers - Light loads, Switching in a line with high capacitive charging current,
Excessive VAR loading

If a generating unit's governor control has a droop characteristic, the unit will: - Answers
- Control the magnitude of governor response for a given change in frequency

Which of the following changes requires notification to PJM Dispatch in real time
operations? - Answers - Any change in unit output >= 50 MW

Intra-day regulation updates can be made no later than - Answers - 65 minute prior to
the beginning of the desired operating hour ending

The daily default regulation offers must be submitted to PJM no later than - Answers -
14:15 EPT the day before the operating day

Who determines voltage schedules at generator buses? - Answers - Transmission
Owners

In addition to Operating Reserves, Synchronized Reserves, and Quick Start Reserve,
_______________________ Reserves are also included in the IRC report. - Answers -
Secondary

, Operating Parameter characteristics of each generator include physical parameters,
cost variables and - Answers - Time variables

Energy offers for the Day Ahead market for the next market day evaluation must be
submitted by what time? - Answers - 11:00

By what hour must resolutions for the TODAY Report in Gen Checkout be handled -
Answers - 04:00

How does the Generation Owner/Operator inform PJM and the TO of scheduled AVR or
PSS outages? - Answers - eDART

Which action could PJM have taken in 1999 to correct the low voltage conditions, but
did not because they thought there were plenty of reactive reserves available? -
Answers - Reduced the MW output of some generators to allow them to supply
additional VARS

With the exception of intermittent resources, Over-excited (Lagging) test results are the
values of MVAR output that can be sustained for how long? - Answers - 60 minutes

A unit (or intermittent facility) will be considered as having passed their capability test
and require no further action if their test results are within what percentage of the stated
test limits? - Answers - 5%

What is the penalty for Units that do not meet their stated reactive capability during
reactive capability testing? - Answers - There is no penalty

If reactive testing for a facility is done at different times, or on different days, what
timeframe does the owner have to complete all the required testing? - Answers - Six
months

When a Generation megawatt outage requires verbal notification to PJM which PJM
personnel should be contacted? - Answers - Master Coordinator

Why does PJM require an additional notification of 30 minutes prior to the GO/MOC
performing the reactive capability test to allow for which of the following? - Answers - To
allow PJM and TOs to make adjustments to system voltages prior to the test

If the outage start date is greater than ___ days in the future, it is classified as a
"Forecasted Planned" outage? - Answers - 31

With whom does PJM share the results of generation reactive capability tests? -
Answers - The affected TO

Document information

Uploaded on
July 1, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(224)
Sold
1175
Followers
882
Items
20900
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions