and Bid Package
Cost Management
EstimationConstruction
and
inBid
CivilPackage
Engineering
Cost Management
Estimation
Study and
Guide.pdf
inBid
CivilPackage
Engineering
Management
Study Guide.pdf
in Civil Engineering Study Guide.pdf
Construction Cost Estimation and Bid
Package Management in Civil
Engineering Study Guide
Guidehttps://www.stuvia.com/dashboard!@_)#*)(@$)($@*($@)($@*_
Construction Cost EstimationConstruction
and Bid Package
Cost Management
EstimationConstruction
and
inBid
CivilPackage
Engineering
Cost Management
Estimation
Study and
Guide.pdf
inBid
CivilPackage
Engineering
Management
Study Guide.pdf
in Civil Engineering Study Guide.pdf
,Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf
Terms in this set (59)
Determination of probable construction cost for Estimate
given project
Know the Three (3) Basic Steps to Estimating 1..Scope : Identify the "work items" for the project
2..Quantities: measure the amount of "work items"
3..Pricing: determine the cost of "work items"
Know the Three (3) Goals of an Estimate Completeness
Accuracy
Profit Potential
Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf
, Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf Construction Cost Estimation and Bid Package Management in Civil Engineering.pdf
Be Familiar with the Three (3) Types of Estimates and Conceptual Estimate - Single Rate
How Each is Performed
Preliminary Estimate - Muti
Detailed Estimate - Fully Itemized
•An Owner would like to build a 60,000sf Concrete Conceptual Estimate - Single Rate
Tilt-Up warehouse in Oakland, CA•Based on past
projects completed by your company with similar
criteria, you determine $250/sf is reasonable$250/sf
x 60,000sf = $15,000,000