CSLB C10 CERTIFICATION EVALUATION
COMPLETE QUESTIONS AND ANSWERS
GRADED A PLUS

●● 2. Raceways are taken off per _____. Fittings required to make turns
and extensions are taking off per _____.
Answer: Linear foot, each


●● 3. All wires and conductors are taken off per _____.
Answer: Linear foot


●● 4. All fittings, devices and boxes are taken off per _____.
Answer: Each Item


●● 5. Permits and fees for tie-ins may be listed at lump sum and are
taken off per _____.
Answer: Occurrence,Project, and Contract


●● 6. Control stations are taken off by _______.
Answer: Individual Unit and Each Item.


●● 7. Panelboards are taken off individually according to ______.

,Answer: Type, Size, and Voltage


●● 8. Starters, safety switches and fuses are taken off per _______.
Answer: Each Item


●● 9. _______ should be kept separate from general light fixtures.
Answer: Exit Lighting


●● 10. Interior and exterior lighting should be taken off and listed
_______.
Answer: Separately


●● 11. Lamps for light fixtures are _______.
Answer: Taken off per each Item


●● 12. Light fixtures should be listed in the takeoff according to
_______.
Answer: Color


●● 13. Working electrical drawings numbered sequentially, prefaced by
the letter "E", include _______.
Answer: Telecommunications and security systems only

,●● 14. The _______ shows power requirements of the structure.
Answer: Power plan


●● 15. The _______ aids the electrical contractor sizing the panel.
Answer: Panel Schedule


●● 16. The _______ plan is supplemented by the fixture schedule.
Answer: Lighting


●● 17. The fixture schedule lists lamp _______.
Answer: Wattage


●● 18. Electrical specifications provide _______.
Answer: The grade of materials to be used, Materials installation
specifics, and how materials will be used in the finished system


●● 19. _______ must be maintained by the electrical contractor for all
installed work.
Answer: As-built drawings


●● 20. No conductors are smaller than No. _______ wire.
Answer: 12

, ●● 21. _______ Shall be installed in service entrances and panel feeders.
Answer: Rigid conduit


●● 22. The electrical contractor is responsible for providing and
installing _______ for a complete telephone system.
Answer: Outlet boxes, pull boxes, and empty raceways


●● 23. Interpretation of construction drawings and specifications may
conflict when _______.
Answer: Standard specifications are used with specific working plans,
previously prepared plans are changed and referenced in the
specifications only, and when previously prepared drawings are
amended but not noted on all file drawings


●● 24. Site preparation information is provided on the _______ plan.
Answer: Site


●● 25. The electrical contractor is responsible for all site _______.
Answer: Excavation, surface repair, and pumping


●● 26. To avoid incurring additional costs due to broken lines,
underground wires and utilities must be located _______.
Answer: Before digging

Document information

Uploaded on
June 28, 2026
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(25)
Sold
251
Followers
4
Items
64148
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions