Mk1 SWE Exam with all Correct & 100% Verified Answers
|Actual Complete Exam |Already Graded A+ (Just
Released)
what are two types of maintenance ✔Correct Answer-Corrective and preventative
What article always captain to conduct NJP ✔Correct Answer-Article 15
Where two types of procedures that may be accessed from maintenance procedure option
✔Correct Answer-Official and local
Who is authorized to conduct tag outs ✔Correct Answer-Authorizing officer
Out of calibration tags should be used when ✔Correct Answer-When indicating parameter
errors are small and consistent
For modernized units the boat inspection reports are to be entered through ✔Correct
Answer-Almis/ EALpage
Cutter engineering report shall be completed in accordance with ✔Correct Answer-Naval
engineering manual chapter 90
On an MPC the warning shall come where in the text ✔Correct Answer-Before the instruction
On an MPC what would constitute an expendable ✔Correct Answer-Rags
PMS that does not need to be included in the cutter engineering report is ✔Correct Answer-
Daily and weekly
With regards to casreps what is mandatory on all updates corrects and cancellations
✔Correct Answer-REF
Which unit besides a shore unit are exempt from filling out the POSIT line ✔Correct Answer-
Cutter underway
A casrep it should be made as soon as possible no later than ____hours ✔Correct Answer-24
Casualties that effect a secondary mission should always have a casualty category of ✔Correct
Answer-2
, AMPN is mandatory after any set that contains an entry of? ✔Correct Answer-Other, tech,
none
In a 1PARTSID if the NIIN is not known what needs to be put in the line ✔Correct Answer-
Unknown
What is the criteria for submitting CASCOR ✔Correct Answer-The delay expressed an hours,
and correcting the casualty due to parts unavailability, a list of all parts requested and dates
received; the total number of man-hours expanded; the number of equipment hours since last
failure
You find something else wrong with the piece of equipment that has already been CASREP'd
you should send an? ✔Correct Answer-Update
Where do you find the hierarchy of guidance for specification plans ✔Correct Answer-NEM
chapter 41
Which specifications may be used as a guided researching propose engineering changes and
solutions ✔Correct Answer-GSO
Which specification do not apply to construction, alteration or maintenance of Coast Guard
cutters ✔Correct Answer-Commercial general specifications for t-ships
Where do you find the authorized material list for deck coverings ✔Correct Answer-Naval
engineering manual chapter 634
110 - WPB - 521-01, what does 5 21 represent ✔Correct Answer-SW BS number
Enthusiasm for realistic drills must outweigh sound judgment, or sound evaluation of the______
✔Correct Answer-State of the crew
Casualty control is used for what type of casualties ✔Correct Answer-Operational and battle
How do you connect the battery in parallel ✔Correct Answer-Positive to positive negative to
negative
How do you hook up an ammeter ✔Correct Answer-In series
What do you clean a battery terminal with ✔Correct Answer-Sodium bicarbonate\ammonia
If a CAN and buss has 120 ohms resistors at each and what is the total resistance on a good
CAM buss ✔Correct Answer-60 ohms
|Actual Complete Exam |Already Graded A+ (Just
Released)
what are two types of maintenance ✔Correct Answer-Corrective and preventative
What article always captain to conduct NJP ✔Correct Answer-Article 15
Where two types of procedures that may be accessed from maintenance procedure option
✔Correct Answer-Official and local
Who is authorized to conduct tag outs ✔Correct Answer-Authorizing officer
Out of calibration tags should be used when ✔Correct Answer-When indicating parameter
errors are small and consistent
For modernized units the boat inspection reports are to be entered through ✔Correct
Answer-Almis/ EALpage
Cutter engineering report shall be completed in accordance with ✔Correct Answer-Naval
engineering manual chapter 90
On an MPC the warning shall come where in the text ✔Correct Answer-Before the instruction
On an MPC what would constitute an expendable ✔Correct Answer-Rags
PMS that does not need to be included in the cutter engineering report is ✔Correct Answer-
Daily and weekly
With regards to casreps what is mandatory on all updates corrects and cancellations
✔Correct Answer-REF
Which unit besides a shore unit are exempt from filling out the POSIT line ✔Correct Answer-
Cutter underway
A casrep it should be made as soon as possible no later than ____hours ✔Correct Answer-24
Casualties that effect a secondary mission should always have a casualty category of ✔Correct
Answer-2
, AMPN is mandatory after any set that contains an entry of? ✔Correct Answer-Other, tech,
none
In a 1PARTSID if the NIIN is not known what needs to be put in the line ✔Correct Answer-
Unknown
What is the criteria for submitting CASCOR ✔Correct Answer-The delay expressed an hours,
and correcting the casualty due to parts unavailability, a list of all parts requested and dates
received; the total number of man-hours expanded; the number of equipment hours since last
failure
You find something else wrong with the piece of equipment that has already been CASREP'd
you should send an? ✔Correct Answer-Update
Where do you find the hierarchy of guidance for specification plans ✔Correct Answer-NEM
chapter 41
Which specifications may be used as a guided researching propose engineering changes and
solutions ✔Correct Answer-GSO
Which specification do not apply to construction, alteration or maintenance of Coast Guard
cutters ✔Correct Answer-Commercial general specifications for t-ships
Where do you find the authorized material list for deck coverings ✔Correct Answer-Naval
engineering manual chapter 634
110 - WPB - 521-01, what does 5 21 represent ✔Correct Answer-SW BS number
Enthusiasm for realistic drills must outweigh sound judgment, or sound evaluation of the______
✔Correct Answer-State of the crew
Casualty control is used for what type of casualties ✔Correct Answer-Operational and battle
How do you connect the battery in parallel ✔Correct Answer-Positive to positive negative to
negative
How do you hook up an ammeter ✔Correct Answer-In series
What do you clean a battery terminal with ✔Correct Answer-Sodium bicarbonate\ammonia
If a CAN and buss has 120 ohms resistors at each and what is the total resistance on a good
CAM buss ✔Correct Answer-60 ohms