ET1 SWE Exam with all Correct & 100% Verified Answers
|Actual Complete Exam |Already Graded A+
ESD Maintenance Supervisor duties ✔Correct Answer-1.) Schedule/Unscheduled
Maintenance for ESD, C4IT assets w/in AOR is complete.
2.) Oversee ESD test equipment and tool calibration program.
RPQ 6.1.3
MDL (Maintenance Due List) step 2: ✔Correct Answer-Click on "Decision Support System"
(DSS) 4.5
RPQ 6.1.3.2
Noise exposure data must be kept for how long? ✔Correct Answer-For the duration of
employment plus 30 years.
RPQ 6.3.1.1
Areas or equipment where the sound pressure levels are _____(A) or greater, but LESS THAN
______dB(A), must be labeled and must require the use of single protection. ✔Correct
Answer-85....96
The QA Inspector must be recommended by their ______ ___________ _________________
✔Correct Answer-ESD Maintenance Supervisor
C4IT assets without personnel assigned such as DGPS or R21 requires _______ travel card(s) for
the entire trip. ✔Correct Answer-ONE (1)
MS submits completed MPC's to Sector CMM...local MPC copies must be maintained on file for
a minimum of ________ ______ ✔Correct Answer-One Year
Technicians shall not work alone when performing maintenance on any energized equipment
where voltages in excess of ____ volts exist. ✔Correct Answer-30
AFC-____ funds to procure crane, dive or other services for the repair and/or replacement of
Coast Guard owned electronic equipment. ✔Correct Answer-42
AFC-_____ funds for repair/replacement of Navy Type-Navy Owned electronic equipment.
✔Correct Answer-80
At NO TIME is the ESD authorized to install, de-install or modify a unit's standard configuration
without the ___________ _________ ____________ approval. ✔Correct Answer-Product Line
Manager's
,All large work request's requiring _______ labor hours or more to complete shall be forwarded
to _____________ ✔Correct Answer-30....C4ITSC-FSD
Maintenance/Publication Feedback Form (________) is used for initiating changes to technical
manuals, publications, MPC's, or other technical data. ✔Correct Answer-CG-22
_______________ __________________ ___________ (_________) discrepancies are generally
found during an Electronic Technical Assessment (ETA) and require extensive work to correct
✔Correct Answer-Carried Forward Depot (CFD)
Technicians on cutters 175-foot and greater shall use the "_______ _______" field to request
Depot technical assistance or C4IT and Navy parts. ✔Correct Answer-C4IT Assist
All bonds for ground conductors whose primary function is to provide a path for power, control
or signal currents, and lightning protection shall have a maximum dc resistance of
___________(______) ✔Correct Answer-1 milliohm (.oo1 Ohms)
If an intentional protective coating is removed from the metal surface, the mating surfaces shall
be joined within _____ minutes after cleaning. ✔Correct Answer-30
Filters on power control and signal lines shall be placed ____ _______ _____ ___________ to
the point of penetration of the case in order to avoid long, unprotected paths inside the
equipment. ✔Correct Answer-as close as possible
High voltage warning and danger signs shall be posted conspicuously , generally at eye level, on
equipment containing more than _______volts aboard CUTTERS and on equipment containing
more than ______volts at SHORE facilities. ✔Correct Answer-1000....600
The Coast Guard currently uses three types of batteries (1)________ _______ (2)__________
____________ and (3)______________ ✔Correct Answer-Lead Acid......Nickel
Cadmium.....Lithium
Units must label designated hazardous noise areas and equipment that produce sound levels
______dB(A) or greater. ✔Correct Answer-85
Type _____ warning sign advises personnel of an RF hazard and shall be posted at the boundary
(PEL line) of an area... ✔Correct Answer-1
Type ____ warning sign informs personnel that an RF hazard exists and to check with command
authority prior to fueling operations. ✔Correct Answer-4
Type ______ Warning Sign excludes personnel from proceeding past a designated point.
✔Correct Answer-2
, Type ______ warning sign informs personnel that contact current and/or RF burn hazards may
exist on metallic objects in this area. ✔Correct Answer-3
Type ______ warning sign provides a blank area in which special instructions necessary for safe
operations can be specified. ✔Correct Answer-5
The CG Test Equipment Petty Officer (TEPO) must validate ETE calibrate stickers every _______
____________ ✔Correct Answer-6 months
The TEPO shall submit a survey report for any missing test equipment above $_______
✔Correct Answer-$25K
Report of survey form CG-_________ ✔Correct Answer-5269
The SCAT Code is based on _______________, not manufacturers. ✔Correct Answer-
capabilities
Priority of _____ or _______ (obsolete or nearing the end of service life) ✔Correct Answer-
72....95
________ and _________ shall be stored separately from FSTER and Non-SCAT coded test
equipment. ✔Correct Answer-GPETE......SPETE
Test equipment calibration is organizational level maintenance and is ______-______ funded.
✔Correct Answer-AFC-30
All test equipment shall be tracked within _________ ✔Correct Answer-FLS
The only navy type/navy owned (NTNO) special purpose electronic test equipment (SPETE)
deployed by the USCG is the ETE that supports the ____________ ✔Correct Answer-IFF -
identification, friend or foe
A DC bond resistance should measure about __________ohm or better ✔Correct
Answer-.001
If lost ETE is listed on the _____________ and the cost is above __________ in value the TEPO
shall complete a USCG Form _____________ ✔Correct Answer-SPETERL......$25K..........CG-
5269
Two types of TDR's ✔Correct Answer-Tektronix Model 1503B - Digital
Tektronix Model 1502 - Analog
TDR Measurements should be recorded on a ___________ - _______ ✔Correct Answer-
NAVSEA-531
|Actual Complete Exam |Already Graded A+
ESD Maintenance Supervisor duties ✔Correct Answer-1.) Schedule/Unscheduled
Maintenance for ESD, C4IT assets w/in AOR is complete.
2.) Oversee ESD test equipment and tool calibration program.
RPQ 6.1.3
MDL (Maintenance Due List) step 2: ✔Correct Answer-Click on "Decision Support System"
(DSS) 4.5
RPQ 6.1.3.2
Noise exposure data must be kept for how long? ✔Correct Answer-For the duration of
employment plus 30 years.
RPQ 6.3.1.1
Areas or equipment where the sound pressure levels are _____(A) or greater, but LESS THAN
______dB(A), must be labeled and must require the use of single protection. ✔Correct
Answer-85....96
The QA Inspector must be recommended by their ______ ___________ _________________
✔Correct Answer-ESD Maintenance Supervisor
C4IT assets without personnel assigned such as DGPS or R21 requires _______ travel card(s) for
the entire trip. ✔Correct Answer-ONE (1)
MS submits completed MPC's to Sector CMM...local MPC copies must be maintained on file for
a minimum of ________ ______ ✔Correct Answer-One Year
Technicians shall not work alone when performing maintenance on any energized equipment
where voltages in excess of ____ volts exist. ✔Correct Answer-30
AFC-____ funds to procure crane, dive or other services for the repair and/or replacement of
Coast Guard owned electronic equipment. ✔Correct Answer-42
AFC-_____ funds for repair/replacement of Navy Type-Navy Owned electronic equipment.
✔Correct Answer-80
At NO TIME is the ESD authorized to install, de-install or modify a unit's standard configuration
without the ___________ _________ ____________ approval. ✔Correct Answer-Product Line
Manager's
,All large work request's requiring _______ labor hours or more to complete shall be forwarded
to _____________ ✔Correct Answer-30....C4ITSC-FSD
Maintenance/Publication Feedback Form (________) is used for initiating changes to technical
manuals, publications, MPC's, or other technical data. ✔Correct Answer-CG-22
_______________ __________________ ___________ (_________) discrepancies are generally
found during an Electronic Technical Assessment (ETA) and require extensive work to correct
✔Correct Answer-Carried Forward Depot (CFD)
Technicians on cutters 175-foot and greater shall use the "_______ _______" field to request
Depot technical assistance or C4IT and Navy parts. ✔Correct Answer-C4IT Assist
All bonds for ground conductors whose primary function is to provide a path for power, control
or signal currents, and lightning protection shall have a maximum dc resistance of
___________(______) ✔Correct Answer-1 milliohm (.oo1 Ohms)
If an intentional protective coating is removed from the metal surface, the mating surfaces shall
be joined within _____ minutes after cleaning. ✔Correct Answer-30
Filters on power control and signal lines shall be placed ____ _______ _____ ___________ to
the point of penetration of the case in order to avoid long, unprotected paths inside the
equipment. ✔Correct Answer-as close as possible
High voltage warning and danger signs shall be posted conspicuously , generally at eye level, on
equipment containing more than _______volts aboard CUTTERS and on equipment containing
more than ______volts at SHORE facilities. ✔Correct Answer-1000....600
The Coast Guard currently uses three types of batteries (1)________ _______ (2)__________
____________ and (3)______________ ✔Correct Answer-Lead Acid......Nickel
Cadmium.....Lithium
Units must label designated hazardous noise areas and equipment that produce sound levels
______dB(A) or greater. ✔Correct Answer-85
Type _____ warning sign advises personnel of an RF hazard and shall be posted at the boundary
(PEL line) of an area... ✔Correct Answer-1
Type ____ warning sign informs personnel that an RF hazard exists and to check with command
authority prior to fueling operations. ✔Correct Answer-4
Type ______ Warning Sign excludes personnel from proceeding past a designated point.
✔Correct Answer-2
, Type ______ warning sign informs personnel that contact current and/or RF burn hazards may
exist on metallic objects in this area. ✔Correct Answer-3
Type ______ warning sign provides a blank area in which special instructions necessary for safe
operations can be specified. ✔Correct Answer-5
The CG Test Equipment Petty Officer (TEPO) must validate ETE calibrate stickers every _______
____________ ✔Correct Answer-6 months
The TEPO shall submit a survey report for any missing test equipment above $_______
✔Correct Answer-$25K
Report of survey form CG-_________ ✔Correct Answer-5269
The SCAT Code is based on _______________, not manufacturers. ✔Correct Answer-
capabilities
Priority of _____ or _______ (obsolete or nearing the end of service life) ✔Correct Answer-
72....95
________ and _________ shall be stored separately from FSTER and Non-SCAT coded test
equipment. ✔Correct Answer-GPETE......SPETE
Test equipment calibration is organizational level maintenance and is ______-______ funded.
✔Correct Answer-AFC-30
All test equipment shall be tracked within _________ ✔Correct Answer-FLS
The only navy type/navy owned (NTNO) special purpose electronic test equipment (SPETE)
deployed by the USCG is the ETE that supports the ____________ ✔Correct Answer-IFF -
identification, friend or foe
A DC bond resistance should measure about __________ohm or better ✔Correct
Answer-.001
If lost ETE is listed on the _____________ and the cost is above __________ in value the TEPO
shall complete a USCG Form _____________ ✔Correct Answer-SPETERL......$25K..........CG-
5269
Two types of TDR's ✔Correct Answer-Tektronix Model 1503B - Digital
Tektronix Model 1502 - Analog
TDR Measurements should be recorded on a ___________ - _______ ✔Correct Answer-
NAVSEA-531