The examination of residential developers is the same as the examination of a contractor who
builds in accordance with a contract for an owner. - Answer false
CAD drawing improved the artistic aspect of designing dramatically. - Answer false
CAD, linked to analysis, has been one of the most powerful reasons for using CAD. - Answer
true
A quantity surveyor should be called upon in the early stages of consultation by the client. -
Answer true
Generally, the construction managers perform construction work on the projects, and are liable
for defects in the construction. - Answer false
A building contractor is paid for work completed and is never paid in advance. - Answer true
Shapes are easier to visualise and intersections of surfaces can be seen in the orthographic form
of drawings. - Answer false
Bid bonds protect the owner if the contractor fails to complete the construction work - Answer
false, performance
CAD produces 3D and digital representations of the physical and functional characteristics of the
facility - Answer false, BIM
Orthographic views distort the lengths of lines and angles at corners. - Answer false
Construction documents consist of two fundamental parts, Bidding documents and Drawings. -
Answer false, specifications and drawings
Pictorials drawings are used for production and detail design. - Answer false
BIM offers the potential of dramatically increasing the quality of design. - Answer true
, CAD substantially changes the process or the way in which the information is displayed. -
Answer false
At site level, the builder will be the most senior construction team member for the contractor. -
Answer true
The Builder's role in building development process starts from the construction stage. - Answer
false
The analysis of the requirements of occupiers and ensuring that they are incorporated into the
design is one of major roles of the sureties companies - Answer false
Who is the professional that is specifically trained, through formal academic and practical
experience, to manage the execution process of building projects on day-to-day basis? - Answer
builder
is a complete list of the materials and labour operations necessary to construct a building,
together with a measurement of the quantities of materials and work involved. - Answer bill
of quantity
The _____________ will ensure that the project quality management plan and stage of work is
in conformity with the design. - Answer project manager
These views are often used for advertising, repair manuals, and general information - Answer
pictorial views
These views describe the shape of the object by looking directly at the faces of the object. -
Answer orthographic views
The main task of the _____________ on a building development project is to provide estimates
for rental and capital value as well as to identify potential buyers and/or occupiers - Answer
estate surveyor and valuer
will touch and affect everyone and every business dealing with design, construction,
manufacturing, facilities management and building ownership. - Answer BIM
is the future of architecture and engineering drawing and documentation (and much more:
analysis, rendering, costing, purchasing). - Answer BIM
started as 2D only, but has now progressed to 3D. - Answer CAD