Activity-on-node - correct answer ✔Network diagramming notation that places activities in the nodes
and arrows to signify precedence relationships.
Beta probability distribution - correct answer ✔Typically represents project activities.
Crashing - correct answer ✔Reducing the completion time of the project.
Critical chain approach - correct answer ✔Focus on the final due date that is based on the theory of
constraints.
Critical path - correct answer ✔The longest sequential path through the network diagram.
Critical path method - correct answer ✔Network planning technique, with deterministic times, used to
determine a project's planned completion date and identify the project's critical path.
Deterministic time estimate - correct answer ✔Assumption that the activity duration is known with
certainty.
Most likely time estimate - correct answer ✔The normal time that the activity is expected to take.
Optimistic time estimate - correct answer ✔The shortest time period in which the activity can be