SWE Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+
Agile/Adaptive ✔Correct Answer-more iterative, going through phases but does not have
everything as planned out.
Waterfall method ✔Correct Answer-Each phase completed and falls into the next one
(Analyze, Design, Code, Test, Maintain)
Scrum ✔Correct Answer-incremental and iterative approach; small sprints in a cycle of 2
weeks
Spiral ✔Correct Answer-Agile method. Plan → analyze → design/code → evaluate/test
→(REPEAT); not time representative; cycle
Extreme Programming ✔Correct Answer-Popular agile method that started pair programming
DevOps ✔Correct Answer-implemented in several phases with several tools, combination of
development and operations
Formula for productivity ✔Correct Answer-KLOC/people*months (more = better)
Formula for Cost effectiveness ✔Correct Answer-$K/KLOC = $/LOC (less = better)
Project A - 24 months, $200k, 3 people, 30k lines of code
Project B - 48 months, $450k, 4 people, 70k lines of code
Who is more productive? ✔Correct Answer-Project A
Project A - 24 months, $200k, 3 people, 30k lines of code
Project B - 48 months, $450k, 4 people, 70k lines of code
Who is more cost effective? ✔Correct Answer-Project B
Give an example effort estimation table ✔Correct Answer-Tasks- Analyze Design Code Test;
totals are in person months
Name major risks of developing software and potential impacts on the project ✔Correct
Answer-members working part-time; high turnover; complex data environment; users unsure of
their needs; users have little experience.
Impacts: time and money
In software engineering, describe what CASE stands for and what it is ✔Correct Answer-CASE
= Computer Aided Software Engineering
Actual Complete Exam |Already Graded A+
Agile/Adaptive ✔Correct Answer-more iterative, going through phases but does not have
everything as planned out.
Waterfall method ✔Correct Answer-Each phase completed and falls into the next one
(Analyze, Design, Code, Test, Maintain)
Scrum ✔Correct Answer-incremental and iterative approach; small sprints in a cycle of 2
weeks
Spiral ✔Correct Answer-Agile method. Plan → analyze → design/code → evaluate/test
→(REPEAT); not time representative; cycle
Extreme Programming ✔Correct Answer-Popular agile method that started pair programming
DevOps ✔Correct Answer-implemented in several phases with several tools, combination of
development and operations
Formula for productivity ✔Correct Answer-KLOC/people*months (more = better)
Formula for Cost effectiveness ✔Correct Answer-$K/KLOC = $/LOC (less = better)
Project A - 24 months, $200k, 3 people, 30k lines of code
Project B - 48 months, $450k, 4 people, 70k lines of code
Who is more productive? ✔Correct Answer-Project A
Project A - 24 months, $200k, 3 people, 30k lines of code
Project B - 48 months, $450k, 4 people, 70k lines of code
Who is more cost effective? ✔Correct Answer-Project B
Give an example effort estimation table ✔Correct Answer-Tasks- Analyze Design Code Test;
totals are in person months
Name major risks of developing software and potential impacts on the project ✔Correct
Answer-members working part-time; high turnover; complex data environment; users unsure of
their needs; users have little experience.
Impacts: time and money
In software engineering, describe what CASE stands for and what it is ✔Correct Answer-CASE
= Computer Aided Software Engineering