SWT301 COURSE ASSESSMENT 2026
COMPLETE PREPARATION QUESTIONS AND
ANSWER KEY
◉ Q. 119: Incidents would not be raised against:
A. Requirements
B. Documentation
C. Test cases
D. Improvements suggested by users
Answer: B
◉ Q. 120: The Planning phase of a formal review includes the
following :-
A. Explaining the objectives
B. Selecting the personnel, allocating roles.
C. Follow up
D. Individual Meeting preparations
Answer: D
◉ Q. 122: One of the fields on a form contains a text box which
accepts numeric values in the range of 18 to 25. Identify the invalid
Equivalance class
,A. 17
B. 19
C. 24
D. 21
Answer: A
◉ Q. 123: Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible
Answer: C
◉ Q. 124: Which tool needs to interface with other office automation
software in order to generate reports in the format required by the
organization?
A. Progress tracking tools
B. Test management tools
C. Metrics management tools
D. Test execution tools
Answer: B
, ◉ Q. 125: Which one is not comes under international standard
A. IEC
B. IEEE
C. ISO
D. All of the above
Answer: B
◉ Q. 126: In which phase static tests are used
A. Requirements
B. Design
C. Coding
D. All of the above
Answer: D
◉ Q. 127: What's the disadvantage of Black Box Testing
A. Chances of having repetition of tests that are already done by
programmer.
B. The test inputs needs to be from large sample space.
C. It is difficult to identify all possible inputs in limited testing time.
So writing test cases is slow and difficult
D. All above
Answer: D
COMPLETE PREPARATION QUESTIONS AND
ANSWER KEY
◉ Q. 119: Incidents would not be raised against:
A. Requirements
B. Documentation
C. Test cases
D. Improvements suggested by users
Answer: B
◉ Q. 120: The Planning phase of a formal review includes the
following :-
A. Explaining the objectives
B. Selecting the personnel, allocating roles.
C. Follow up
D. Individual Meeting preparations
Answer: D
◉ Q. 122: One of the fields on a form contains a text box which
accepts numeric values in the range of 18 to 25. Identify the invalid
Equivalance class
,A. 17
B. 19
C. 24
D. 21
Answer: A
◉ Q. 123: Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible
Answer: C
◉ Q. 124: Which tool needs to interface with other office automation
software in order to generate reports in the format required by the
organization?
A. Progress tracking tools
B. Test management tools
C. Metrics management tools
D. Test execution tools
Answer: B
, ◉ Q. 125: Which one is not comes under international standard
A. IEC
B. IEEE
C. ISO
D. All of the above
Answer: B
◉ Q. 126: In which phase static tests are used
A. Requirements
B. Design
C. Coding
D. All of the above
Answer: D
◉ Q. 127: What's the disadvantage of Black Box Testing
A. Chances of having repetition of tests that are already done by
programmer.
B. The test inputs needs to be from large sample space.
C. It is difficult to identify all possible inputs in limited testing time.
So writing test cases is slow and difficult
D. All above
Answer: D