SACA Level 101 Exam Questions With
Correct Answers
What is the definition of value-added activities - CORRECT ANSWER✔✔-
| | | | | | | | |
Activity that adds what the customer wants
| | | | | |
Non-value-added activities are considered waste if they fall into one of
| | | | | | | | | | |
the eight categories. Which waste includes poor workplace organization
| | | | | | | | |
and layout issues? - CORRECT ANSWER✔✔-Excess Motion
| | | | | |
Which of these is NOT a primary goal of a lean manufacturing system? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Greater production volume
| | |
What step is sorting in the 5S process? - CORRECT ANSWER✔✔-First
| | | | | | | | | |
What 5S step makes sure everything is safe for the operator to retrieve
| | | | | | | | | | | | |
with minimal effort and movement? - CORRECT ANSWER✔✔-Straighten
| | | | | | |
What 5S step involves formatting 5S work instructions so that they look
| | | | | | | | | | | |
and read alike? - CORRECT ANSWER✔✔-Standardize
| | | | |
, The automation of many different manufacturing processes is done
| | | | | | | | |
through the use of a small computer called a __________ - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-PLC - Programmable Logic Controller | | | |
After correcting an issue what screen should be checked to ensure there
| | | | | | | | | | |
are no more problems before restarting the machine? - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Alarm
When a machine stops due to a problem, what would the machine's
| | | | | | | | | | | |
HMI typically display? - CORRECT ANSWER✔✔-An error message
| | | | | | |
When the machine operator panel's cycle indicator is ON, what is the
| | | | | | | | | | | |
machine performing? - CORRECT ANSWER✔✔-Automatic Sequence
| | | | |
What type of device does an HMI panel replace in a PLC controlled
| | | | | | | | | | | | |
process? - CORRECT ANSWER✔✔-Hard-wired operator panel
| | | | |
Smart sensors connected to manufacturing networks creates what level
| | | | | | | | |
of industry? - CORRECT ANSWER✔✔-Industry 4.0
| | | | |
Which of the following items marked the advent of the 3rd industrial
| | | | | | | | | | | |
revolution? - CORRECT ANSWER✔✔-Computers | | |
Correct Answers
What is the definition of value-added activities - CORRECT ANSWER✔✔-
| | | | | | | | |
Activity that adds what the customer wants
| | | | | |
Non-value-added activities are considered waste if they fall into one of
| | | | | | | | | | |
the eight categories. Which waste includes poor workplace organization
| | | | | | | | |
and layout issues? - CORRECT ANSWER✔✔-Excess Motion
| | | | | |
Which of these is NOT a primary goal of a lean manufacturing system? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-Greater production volume
| | |
What step is sorting in the 5S process? - CORRECT ANSWER✔✔-First
| | | | | | | | | |
What 5S step makes sure everything is safe for the operator to retrieve
| | | | | | | | | | | | |
with minimal effort and movement? - CORRECT ANSWER✔✔-Straighten
| | | | | | |
What 5S step involves formatting 5S work instructions so that they look
| | | | | | | | | | | |
and read alike? - CORRECT ANSWER✔✔-Standardize
| | | | |
, The automation of many different manufacturing processes is done
| | | | | | | | |
through the use of a small computer called a __________ - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-PLC - Programmable Logic Controller | | | |
After correcting an issue what screen should be checked to ensure there
| | | | | | | | | | |
are no more problems before restarting the machine? - CORRECT
| | | | | | | | | | |
ANSWER✔✔-Alarm
When a machine stops due to a problem, what would the machine's
| | | | | | | | | | | |
HMI typically display? - CORRECT ANSWER✔✔-An error message
| | | | | | |
When the machine operator panel's cycle indicator is ON, what is the
| | | | | | | | | | | |
machine performing? - CORRECT ANSWER✔✔-Automatic Sequence
| | | | |
What type of device does an HMI panel replace in a PLC controlled
| | | | | | | | | | | | |
process? - CORRECT ANSWER✔✔-Hard-wired operator panel
| | | | |
Smart sensors connected to manufacturing networks creates what level
| | | | | | | | |
of industry? - CORRECT ANSWER✔✔-Industry 4.0
| | | | |
Which of the following items marked the advent of the 3rd industrial
| | | | | | | | | | | |
revolution? - CORRECT ANSWER✔✔-Computers | | |