Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

ACI Written Exam Questions with Verified Solutions

Document preview thumbnail
Preview 2 out of 9 pages

ACI Written Exam Questions with Verified Solutions

Content preview

ACI Written Exam Questions with
Verified Solutions

The sensor of the temperature measureing device shall be submerged a minimum of
____ in - ANSWER-3 (75mm)

The temperature measureing device shall have a capacity of measuring temperature of
freshly mixed conrcrete to +-_____ degrees F throught a range of _____ - ANSWER-
1(.5 degrees C), 30-120 (0-50 degrees C)

The temperature measuring device shall be calibrated____, or whenever there is a
question of _____ - ANSWER-annually, accuracy

The temp of concrete may be measured in a wheelbarrow - ANSWER-true

the temp of concrete may be measured in a wall form - ANSWER-true

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temp. - ANSWER-false

What must be done to the sample container prior to sampling the concrete - ANSWER-
dampen (with water)

what must be done to the concrete surrounding the temp measuring device after the
device has submerged - ANSWER-Press concrete around measuring device

How long must the temp device remain in the concrete - ANSWER-at least 2 minutes
(but no more than 5)

After temp of concrete is read, what then is required - ANSWER-reporting of temp

the temp of concrete to be measured to the nearest ____degree F - ANSWER-1 (.5
degree C)

According to the ASTM C1064 what is one reason to take the temp of concrete -
ANSWER-verify conformance to a specified requirement for temp

A max temp of concrete is specified in ASTM C1064 - ANSWER-False

The sample of concrete used for temp determination must be rodded 25 times -
ANSWER-False

, Sampling by this method is required when tests are to be made to determine ____ with
specification requirements - ANSWER-compliance

The method covers sampling from four types of mixers which are _____, _____, ____,
and _______ - ANSWER-stationary mixes, paving mixers, revolving drum mixers and
open top mixers

The maximum allowable time between obtaining the first and final portions of a
composite sample is ______ minutes - ANSWER-15

Portions of a composite sample shall be thoroughly remixed before beginning tests on
the sample - ANSWER-True

The maximum elapsed time allowed between obtaining the final portion of the
composite sample and beginning the tests for slump, temp, and air content is ______
minutes - ANSWER-5

the molding of strength test specimens shall begin within ____ minutes after fabricating
the composite sample - ANSWER-15

The concrete sample must be protected from contamination and ____ - ANSWER-rapid
evaporation

The minimum size sample test specimen is - ANSWER-28 L (1ft^3)

when sampling from a stationary mixer the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch -
ANSWER-2

The composite sample for a paving mixer must represent a minimum of _____ different
portions of the batch of concrete taken from the pile after discharge - ANSWER-5

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of ______ regularly spaced intervals during discharge of the middle portion of
the batch - ANSWER-2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site - ANSWER-False

The composite sample from a truck mixer must be obtained from the _____ portion of
the batch - ANSWER-Middle

When the concrete contains aggregate larger than permitted for a particular test
method, the sample fo concrete must be ______ ______ before making the test -
ANSWER-Wet Sieved

Document information

Uploaded on
June 21, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
1
Items
855
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions