Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

ACI Grade 1 Field Testing Certification Practice Test – Irving

Document preview thumbnail
Preview 2 out of 8 pages

ACI Grade 1 Field Testing Certification Practice Test – Irving

Content preview

ACI Grade 1 Field Testing Certification
Practice Test – Irving

For concrete with aggregates less than 3 inches, the thermometer must remain in the
fresh concrete sample a minimum of 5 minutes or until the temperature reading
stabilizes. (T or F) - ANSWER-False (2-5 minutes)

The temperature measuring device must be accurate to within 0.1 degree. (T or F) -
ANSWER-


The elapsed time between the start of filling the slump cone and the removal of the
cone must be no more than: - ANSWER-2 1/2 minutes

The slump should be measured to the nearest - ANSWER-Quarter of an inch

In order to determine slump, you should measure the vertical distance from: -
ANSWER-Top of the mold to the displaced original center of the top surface

The dimensions of the slump cone are: - ANSWER-Top diameter 4 inches, bottom
diameter 8 inches, height 12 inches

In the slump test, if a decided falling away or shearing off the concrete from one side or
portion of the mass occurs upon raising the slump cone, one should: - ANSWER-
Disregard the test and make a new test on another portion of the sample

The slump cone should be struck-off with: - ANSWER-The tamping rod

The slump cone must be placed: - ANSWER-On a flat moist, non-absorbent, rigid
surface

When rodding the second and third layers, the rod should penetrate the preceding layer
by about 1 inch. (T or F) - ANSWER-True

The normal ½ cubic foot bucket may not be used to determine Density (unit weight) of
lightweight concrete. (T or F) - ANSWER-False (0.2 bucket)

Concrete slump of less than 1 inch should be consolidated using a vibrator. (T or F) -
ANSWER-True

, ASTM C138 states, "the minimum capacity of the bucket depends on the maximum
slump requirement." (T or F) - ANSWER-False

According to ASTM C138, after rodding each layer, tap the sides of the container, with
the rod exactly 25 times. (T or F) - ANSWER-False

The outside of the density bucket should be cleaned before weighing. (T or F) -
ANSWER-True

Concrete with a slump less than 1 inch should be rodded 25 times per layer. (T or F) -
ANSWER-False (Use Vibrator)

According to C138, concretes with slumps of 1-3 inches may be compacted with the
vibrator or the rod. (T or F) - ANSWER-True

The unit weight bucket must be calibrated at least once a month. (T or F) - ANSWER-
False

According to ASTM C138, when rodding the bottom layer, the rod shall not forcibly
strike the bottom of the measure. (T or F) - ANSWER-True

The strike-off plate must be: - ANSWER-At least 1/4 inch thick if metal
At least 1/2 inch thick if glass or acrylic
Flat
(All of the above)

Given the following: wt of bucket 16.2 lbs, volume of bucket =0.498 cf, wt of bucket and
concrete 88.5 lbs. - ANSWER-177.2 lb/ft^3

What is the optimum amount of the concrete that should be protruding above the top of
the mold after the third layer has been tapped by the mallet? - ANSWER-About a 1/8th
inch

After strike-off, the next operation is: - ANSWER-Clean the excess concrete from the
exterior of the measure

Strike-off density (unit weight) bucket by: - ANSWER-Using a flat plate in a sawing
motion

If the density (unit weight) of concrete is 146 lb/ft³ and the total batch weight is 35,468
lb., what is the yield? - ANSWER-9.0 yd^3

The tamping, rod used for the unit weight test: - ANSWER-A round, straight steel rod
Has a 5/8 diameter with the tamping end rounded
Is approximately 24 inches in length
(All of the above)

Document information

Uploaded on
June 21, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
1
Items
855
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions