Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 29 pages
Exam (elaborations)

ACI- Concrete Field-Testing Technician Exam with Complete Solutions

Document preview thumbnail
Preview 3 out of 29 pages

ACI- Concrete Field-Testing Technician Exam with Complete Solutions

Content preview

ACI- Concrete Field-Testing
Technician Exam with Complete
Solutions

Q1. Start molding specimens for strength tests within 30 minutes after fabricating the
composite sample.

A. True
B. False - ANS-B. False

ASTM C172 -Para (4.1.2) - Start molding.
specimens for strength tests within 15 min after fabricating the
composite sample.

Q2. The maximum allowable time between obtaining the first and last portions of the
composite sample may not exceed 5 minutes.

A. True
B. False - ANS-B. False

ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining
the first and final portions of the composite sample.

Q3. The composite concrete sample must be protected from sun, wind, contamination
and rapid evaporation.

A. True
B. False - ANS-A. True

ASTM C172 - Para (4.1.2)

Q4. If the concrete contains aggregates larger than those that are appropriate for a size
of mold or equipment used, the sample should be wet sieved before making the test.

A. True
B. False - ANS-A. True

ASTM C172- Para (6.1)

Q5. The composite sample should not be remixed before beginning any tests.

,A. True
B. False - ANS-B. False

ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the
minimum amount necessary to ensure uniformity and compliance with the maximum
time limits

Q6. Sampling should normally be performed, as the concrete is discharged from the
mixer.

A. True
B. False - ANS-B. False

ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the
concrete is delivered from the mixer.

To the conveying vehicle used to transport the
concrete to the forms; however, specifications may require other points of sampling,
such as the discharge of a concrete pump.

Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck
mixers, agitators, and non-agitating equipment.

A. True
B. False - ANS-A. True

ASTM C172- Para (1.1)

Q8. After sampling is completed, start the tests for slump and air content within:

A. 2 ½ minutes
B. 10 minutes
C. 15 minutes
D. None of the above - ANS-D. None of the above

ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5
min after obtaining the final portion of the composite sample.

Q9. In any case, do not obtain samples until:

A. All the water and admixtures have been added to the concrete
B. 200 revolutions of the drum have been obtained
C. ½ of the water has been added
D. None of the above - ANS-A. All the water and admixtures have been added to the
concrete.

, ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water
has been added to the mixer.

Q10. No samples shall be taken before_________ or after_________ of the batch has
been discharged.

A. 10% or after 90%
B. 20% or after 90%
C. 20% or after 80%
D. None of the above - ANS-A. 10% or after 90%

ASTM C172- Para (5.2.1).

NOTE 3—No samples should be taken before 10 % or after 90 % of the batch has been
discharged.

Due to the difficulty of determining the actual quantity of concrete discharged, the intent
is to provide samples that are representative of widely separated portions, but not the
beginning and the end of the load.

Q11. When strength tests are to be made, the minimum size of the composite sample
shall be:

A. ¼ cubic foot
B. 1 cubic foot
C. Any convenient size
D. 1 Wheelbarrow - ANS-B. 1 cubic foot

ASTM C172- Para (5.1).

Make the samples to be used for strength tests a minimum of 28 L (1 ft3).

Q12. Sample the concrete from the chute of a truck mixer by:

A. Raising chute to stop the flow and scoop concrete from there into the slump cone
and cylinder molds
B. Passing a receptacle completely through the discharge steam or by completely
diverting the discharge into the sample container
C. Holding a shovel in the flow and direct half into a bucket
D. None of the above - ANS-B.

Passing a receptacle completely through the discharge steam or by completely diverting
the discharge into the sample container.

ASTM C172- Para (5.2.3).

Document information

Uploaded on
June 21, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
1
Items
855
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions