Exam coverage: -
• A thorough grasp of Georgia contractor licensing statutes, net
worth thresholds, and renewal procedures.
• Clear understanding of mechanics lien timelines (Notice of Intent,
Claim filing, Preliminary Notice).
• Ability to differentiate contract types (lump sum, cost‑plus, unit
price, T&M) and their risk allocations.
• Knowledge of project delivery methods (Design‑Bid‑Build,
Design‑Build, CMAR) and scheduling tools (CPM, Gantt).
• Familiarity with surety bonds (bid, performance, payment) and
insurance requirements (general liability, workers’ comp, builder’s
risk).
• Understanding of financial documents (balance sheet, income
statement), job costing, and overhead allocation.
• Competence in change order management, RFI processes, and
subcontractor administration.
• Awareness of OSHA safety, environmental compliance, and quality
assurance/control fundamentals.
• Recognition of substantial completion, punch lists, closeout
documentation, and lien waiver procedures.
, Page 2 of 134
• Overall, the exam tests practical knowledge for a Georgia
commercial contractor to operate legally, safely, and profitably.
Question 1. Which drawing in a construction document set typically
shows the location of structural steel columns, beam sizes, and
connection details?
A) Architectural floor plan
B) Structural framing plan ✓
C) Mechanical layout plan
D) Landscape plan
Correct Answer: B
Rationale: A structural framing plan details the size, spacing, and type of
steel members and their connections, whereas architectural plans focus
on finishes and space usage.
Question 2. When performing a quantity takeoff for concrete footings,
what is the most accurate method to determine volume?
A) Measuring the linear footage of the footing and multiplying by width
and depth
B) Using the area of the footing plan and multiplying by the average depth
✓
C) Adding the volume of each separate formwork component
D) Estimating based on the number of reinforcement bars
Correct Answer: B
, Page 3 of 134
Rationale: Concrete volume for footings is calculated by multiplying the
plan area (length × width) by the average depth, providing a precise
volume measurement.
Question 3. In cost estimating, the "unit price" method is best suited for
which type of construction work?
A) Projects with highly variable labor rates
B) Items that are purchased in large, consistent quantities ✓
C) Custom fabricated components with unique specifications
D) Overhead and profit calculations
Correct Answer: B
Rationale: The unit price method applies a fixed price per unit of work
(e.g., per square foot), ideal when quantities are large and consistent.
Question 4. Which Georgia statute governs the licensing of residential
and general contractors?
A) O.C.G.A. Title 43, Chapter 41 ✓
B) O.C.G.A. Title 34, Chapter 8
C) O.C.G.A. Title 50, Chapter 13
D) O.C.G.A. Title 10, Chapter 1
Correct Answer: A
Rationale: The State Licensing Board for Residential and General
Contractors operates under O.C.G.A. Title 43, Chapter 41, which sets
licensing requirements, classifications, and disciplinary rules.
, Page 4 of 134
Question 5. A general contractor in Georgia is bidding a public works
project that requires a bid bond. The contractor's bid is $1,250,000.
What is the minimum bid bond amount required if the solicitation
requires 5%?
A) $62,500 ✓
B) $125,000
C) $31,250
D) $62,000
Correct Answer: A
Rationale: 5% of $1,250,000 equals $62,500. A bid bond guarantees that
the bidder will enter into the contract and provide required performance
and payment bonds if awarded the project.
Question 6. Which of the following business structures provides the
owner with the least personal liability protection?
A) Corporation
B) Limited Liability Company
C) Partnership
D) Sole Proprietorship ✓
Correct Answer: D
Rationale: A sole proprietorship does not provide any legal separation
between the owner and the business, so the owner has unlimited
personal liability for business debts and obligations.