How often is HP piping expansion joints inspected?- answer>>>Weekly

How long should a hydronic system be pressure tested for?- answer>>>2 hours at no
less than 100 psig

How is a gage protected from excessive pressure?- answer>>>Shut off cock

Who is authorized to witness a test on a gas piping system?- answer>>>Plumbing
inspector, architect, licensed PE, master plumber, agency by the DOB

How should a remote disconnect be labeled?- answer>>>Remote control for burner

When is a fusible plug not needed to be installed on a boiler?- answer>>>Over 200 psig

When shall a power boiler with a MAWP over 400 be tested?- answer>>>Pressure
tested annually

What shall a design plan of a boiler and application contain but not limited to?-
answer>>>Size, location, operating pressure + temperature of the pressure vessel and
type + specs of PRV

Who is responsible for maintaining the copies of the certified welder qualifications
report?- answer>>>The welding agency and shall be available to the DOB

Who needs to furnish a control diagram and boiler operation instructions?-
answer>>>The installer

Who will certify and calibrate all gages utilized for testing?- answer>>>A testing
operator

What shall be placed in between different joints and piping material?- answer>>>An
approved adapter fitting

What items are exempt from the reporting requirements?- answer>>>The seal welds of
the tubes and the installation of back rings to man holes and hand holes to boilers

Who will be under control for any welding done to a high pressure tank?- answer>>>An
engineer supervising a welding inspection agency acceptable to the DOB

,At what pressure is it requires to have extra heavy valves installed?- answer>>>100
psig

The ______ files an application for a boiler alteration?- answer>>>Inspector

How many safety valves does a boiler have with over 500 square feet of heating
surface?- answer>>>2

Gas fired boilers not exceeding 100 square feet of heating surface shall be provided
with a?- answer>>>Single or double cone type of hood diverter in the stack

A heater for either liquid fuels or other liquids harmful to the boiler shall not be
installed?- answer>>>Directly in the steam or water space within the boiler

Who is responsible for any spatial relationship between tanks and gas services?-
answer>>>The installer of the last installation to correct a violation

Who is responsible for the setting of operating and safety controls?- answer>>>The
Installing Company

The minimum blowdown for a spring loaded safety valve shall be of what percent of set
pressure?- answer>>>10%

How is the main steam pressure gages tested?- answer>>>With an inspectors gage

Who is in charge of the code for any plumbing installations?- answer>>>The nyc
plumbing code

When will anchorage or guides be inspected?- answer>>>Annually

How many brass washout plugs does a miniature boiler have?- answer>>>3 brass
washout plugs, 1" in size

With what safety fitting shall you protect high pressure steam and water boilers with?-
answer>>>Dual low water cut outs

Spring loaded safety valves have a total combined relieve capacity of?-
answer>>>100% of the max designed capacity of the boiler

What is the total combined relieving capacity of power actuated relieving valves?-
answer>>>No less the 10% of the MAWP or no higher then 20% above the MAWP

What is the minimum blowdown for a spring loaded safety valve?- answer>>>2%

When a boiler is derated what changes?- answer>>>The MAWP decreases and the
BTU output

, In hydronic piping systems where shall a shutoff valve be installed?- answer>>>Before
and after the Pressure Reducing Valve

Hydronic piping joints between steel tubing and fittings shall be?- answer>>>Mechanical
or Welded

What appears on the plate of a boiler?- answer>>>Serial #, name of manufacturer,
serial # of manufacturer, MAWP, heating surface, year built and rated steam capacity

Waste removal of a boiler shall conduct the products of combustion where?-
answer>>>To the atmosphere

When a quick closing valve creates water hammer what is installed on the line?-
answer>>>A water hammer adapter is installed

Safety valve capacity may be checked in what 3 ways?- answer>>>Accumulation test,
evaporative capacity of feed water and amount of fuel burned

Records of inspects are kept where?- answer>>>On the premises

No joint anchorages or guides shall be repaired, replaced or relocated without a work
permit issued by the department. This shall not apply to the repacking of a ___ or ___
joint.- answer>>>Ball or slip joint

Internal high pressure inspection requires the boiler to be ____, ___, ___, and ___.-
answer>>>Shutdown, drained, removal of hand and man holes

The outlet of the blowoff tank is what size?- answer>>>2 times the diameter of the
blowdown piping, 6 inches internal entering the bottom of the blow off tank

What info is not necessary to send to DOB?- answer>>>Use, type, size, location,
operating temp of pressure tanks, and location, type, specs of Pressure Reducing Valve

Miniature boiler specs are ____ ID, ____ft gross volume, ____ft water heating surface,
____MAWP- answer>>>16 ID, 5 ft gross volume, 20 ft heating surface and 100 mawp

Safety valve popping tolerance + capacity up to 70 psig? 71-300 psig, 301-1000 psig,
>1000- answer>>>70 = 2 psig, 71-300 = 3%, 301-1000 = 10 psig, >1000 = 1%

What are other ways of testing safety or relief valve for rated capacity?-
answer>>>Accumulation test, amount of fuel burned, evaporative capacity of feed water

What if someone is found not following the rules and regulations for gas piping
inspections?- answer>>>Revocation of license

Document information

Uploaded on
June 20, 2026
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ihuman
4.6
(85)
Sold
34
Followers
10
Items
566
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions