Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

HIGH PRESSURE STEAM 2026/2027 EXAM NYC COMPLETE QUESTIONS VERIFIED WITH CORRECT ANSWERS

Document preview thumbnail
Preview 3 out of 19 pages

HIGH PRESSURE STEAM 2026/2027 EXAM NYC COMPLETE QUESTIONS VERIFIED WITH CORRECT ANSWERS

Content preview

HIGH PRESSURE STEAM 2026/2027 EXAM
NYC COMPLETE QUESTIONS VERIFIED
WITH CORRECT ANSWERS
1 The maximum blow down for a safety valve on a forced flow steam generator or high
temperature water boiler shall be of what percent of the set pressure?- answer>>>10%.
HP Code: 14-9.12

3 Who oversees the code for any plumbing installations?- answer>>>The NYC
Plumbing Code NYC Mech: 1002.1

4 When will anchorage or guides be inspected?- answer>>>Annually. NYC Mech:
1210.3.1.2

5 How many brass washout plugs does a miniature boiler have?- answer>>>Not less
than 3 Brass Washout Plugs 1 inches in size. HP Code 14-11.5

6 How often are high pressure piping expansion joints inspected?- answer>>>Weekly
RCNY: 20-02 a.2.i (HP steam piping). NYC Mech: 1210.3.1 (hydronics - monthly)

7 How long should a Hydronic System be pressure tested for?- answer>>>2 hours at no
less than 100 PSIG. NYC Mech: 1208.1

8 How is a gauge protected from excessive pressure?- answer>>>Shut off Cock RCNY:
20-03 c,7

9 Who is authorized in witnessing a test on a gas piping system?- answer>>>Plumbing
Inspector, Architect, Licensed PE, Master Plumber, or Agency by the D.O.B RCNY 20-
01 a,1,2

10 How should a remote disconnect be labeled?- answer>>>Remote control for burner.
NYC Mech: 1006.8.1

11 When is a fusible plug not needed to be installed on a boiler?- answer>>>Over 200
PSIG. HP Code: 14-10.17, b

12 When shall a power boiler with a MAWP over 400 be tested?- answer>>>Pressure
tested annually ( safety valve). HP Code: 14-9.7, a,2

13 What shall a Design plan of a boiler and application contain but not limited to?-
answer>>>Size + Location, Operating Pressure + Temperature of the Pressure vessel,
and Type + Specification of Pressure Relief.

,14 Who is responsible for maintaining the copies of the certified welder qualifications
report?- answer>>>Copies of the certified welder qualification report she'll be
maintained by the responsible WELDING AGENCY and the company performing the
welding, and shall be made available upon request to the DOB. RCNY: 20-02, b,2v,/22-
01,d,5. HP Code: 14-3.7

15 Who needs to furnish a control diagram and boiler operation instructions?-
answer>>>The Installer. NYC Mech: 1004.7

16 Who will certify and calibrate all gauges utilized for testing?- answer>>>All gauges
utilized for testing shall be calibrated and certified annually in accordance with ASME
B40.100 by the test operathor. NYC Mech: 1011.2

17 What shall be placed in between different joints and piping material?- answer>>>An
approved Adapter Fitting NYC Mech: 1203.1.2

18 What items are exempt from the reporting requirements?- answer>>>Exemptions:
(1) the installation of backing rings in handhole or manhole openings or the building up
of same; and (2) the seal welding of tubes to the tube sheet. HP Code: 14-3.4, b, 1-2

19. Who will be under control for any welding done to a High-pressure tank?-
answer>>>The welding shall be under controlled inspection of an ENGINEER,
supervising a welding inspection agency acceptable to the DOB RCNY: 22-01 d,2

20 At what pressure is it required to have extra heavy valves installed?- answer>>>HP
Code: 14-10.21b / 14-9.2,b

21 The -------------- files an application for a boiler alteration- answer>>>Inspector HP
Code: 14-3.3 c, 2, ii

22 How many safety valves does a boiler have with over 500 square feet of heating
surface?- answer>>>At least 2 HP Code: 14-9.4a

23 Gas fired Boilers not exceeding 100 square feet of heating surface shall de provided
with a ?- answer>>>Single or Double Cone type of Hood Diverter in the stack HP Code:
14-6.2

24 A heater for either liquid fuels or other liquids harmful to the boiler shall not be
installed?- answer>>>Directly in the steam or water space within a boiler. HP Code: 14-
5.1

25 Who is responsible for any spatial relationship between tanks and gas services?-
answer>>>The Installer of the last installation to correct the violation. RCNY: 22-01, c,3

, Who is responsible for the setting of operating and safety controls?- answer>>>The
Installing Company NYC Mech: 1004.7

27 With what safety fitting shall you protect High Pressure Steam and Water boilers
with?- answer>>>DUAL Low Water Cut Outs. NYC Mech: 1007.1. HP Code: 14- 1. 14,
a

28 Spring loaded safety valves have a total combined relieve capacity of?-
answer>>>100% of the Max Designed Capacity of the Boiler. HP Code: 14-9.5, b

29 What is the total combined relieving capacity of power actuated relieving valves?-
answer>>>NO LESS THAN 10% of the MAWP or NO HIGHER THAN 20% ABOVE the
MAWP. HP Code: 14-9.5, a, b

30 What is the minimum blowdown for a spring-loaded safety valve?- answer>>>2%.
HP Code: 14-9.12

31 When a boiler is de-rated what changes?- answer>>>The MAWP Decreases and the
BTU Output. HP Code: 14-3.21, a

32 In Hydronic piping systems where shall a shutoff valve be installed?-
answer>>>Shutoff valves shall be installed on both sides of a pressure-reducing valve.
NYC Mech: 1205.1.4

33 Hydronic piping joints between steel tubing and fittings shall be?-
answer>>>Mechanical or Welded NYC Mech: 1203.14

34 What appears on the plate of a boiler?- answer>>>Serial #, Name of Manufacturer,
Serial # of manufacturer, MAWP, Heating Surface, Year Built, and Rated Steam
Capacity. HP Code: 14-9.43, d (1-6)

35 Waste Gas removal of a boiler shall conduct the products of combustion where?-
answer>>>To the atmosphere. HP Code: 14-6.1

36 When a quick closing valve creates water hammer what is installed on the line?-
answer>>>An engineered water-hammer arrestor shall be installed. NYC Mech: 1206.7

37 Safety valve capacity may be checked in what 3 ways?- answer>>>Accumulation
Test, Amount of Fuel Burned, Evaporative Capacity of Feed water. HP Code: 14-10.14
(1-3)

Records of inspects are kept where?- answer>>>On the premises. RCNY: 20-02,a,2iii

39 No joint anchorages or guides shall be repaired replaced or relocated without a work
permit issued by the department this shall not apply to the reap king of a

Document information

Uploaded on
June 20, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ihuman
4.6
(85)
Sold
34
Followers
10
Items
568
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions