Question 1
A hospital is experiencing recurring delays in transferring stabilized ICU
patients to general wards due to bed shortages. What is the MOST
effective operational solution?
A. Increase ICU capacity only
B. Implement hospital-wide bed management with discharge acceleration
protocols
C. Delay ICU admissions
D. Reduce ICU admissions criteria
Correct Answer: B
Rationale: Bed management and discharge acceleration address system-
wide flow constraints causing ICU backlogs.
Question 2
A healthcare facility experiences rising operational expenses despite
stable patient volumes. What is the FIRST action an operations manager
should take?
A. Cut staff salaries
B. Conduct process efficiency and cost driver analysis
C. Increase service charges
D. Reduce clinical departments
Correct Answer: B
Rationale: Cost driver analysis identifies inefficiencies before
implementing corrective financial actions.
Question 3
A hospital laboratory reports inconsistent turnaround times for test results.
What is MOST effective?
,A. Increase sample backlog
B. Standardize workflows and introduce automation systems
C. Reduce testing services
D. Outsource all testing immediately
Correct Answer: B
Rationale: Standardization and automation reduce variability and delays.
Question 4
A hospital frequently experiences shortages of critical supplies. What is
BEST solution?
A. Emergency procurement only
B. Predictive inventory management system with forecasting
C. Reduce inventory categories
D. Order manually when stock runs out
Correct Answer: B
Rationale: Forecasting ensures proactive supply availability and
prevents shortages.
Question 5
A hospital outpatient clinic has long patient queues. What is BEST
intervention?
A. Reduce appointments
B. Optimize scheduling and patient flow design
C. Eliminate walk-in patients
D. Increase paperwork requirements
Correct Answer: B
Rationale: Flow optimization reduces congestion and waiting times.
Question 6
A hospital adopts Lean Six Sigma. What is the MAIN goal?
A. Increase process variation
B. Reduce waste and process defects
, C. Increase staffing levels
D. Increase reporting delays
Correct Answer: B
Rationale: Lean Six Sigma focuses on eliminating waste and improving
quality.
Question 7
A hospital has inefficient operating theatre utilization. What is MOST
effective?
A. Reduce surgeries
B. Centralized OR scheduling optimization system
C. Close unused theatres permanently
D. Allow uncoordinated surgeon scheduling
Correct Answer: B
Rationale: Central scheduling improves efficiency and utilization.
Question 8
A healthcare facility experiences frequent equipment downtime. What is
BEST?
A. Reactive maintenance
B. Preventive maintenance system
C. Replace all equipment
D. Ignore failure trends
Correct Answer: B
Rationale: Preventive maintenance reduces breakdowns and downtime.
Question 9
A hospital has delayed discharge processes. What is BEST?
A. Delay discharge approvals
B. Multidisciplinary discharge coordination team
C. Reduce documentation
D. Increase admissions
OPERATIONS MANAGER| LATEST 2025-2026
QUESTION AND CORRECT ANSWER WITH
EXPLANATION WEST COAST UNIVERSITY
Question 1
A hospital is experiencing recurring delays in transferring stabilized ICU
patients to general wards due to bed shortages. What is the MOST
effective operational solution?
A. Increase ICU capacity only
B. Implement hospital-wide bed management with discharge acceleration
protocols
C. Delay ICU admissions
D. Reduce ICU admissions criteria
Correct Answer: B
Rationale: Bed management and discharge acceleration address system-
wide flow constraints causing ICU backlogs.
Question 2
A healthcare facility experiences rising operational expenses despite
stable patient volumes. What is the FIRST action an operations manager
should take?
A. Cut staff salaries
B. Conduct process efficiency and cost driver analysis
C. Increase service charges
D. Reduce clinical departments
Correct Answer: B
Rationale: Cost driver analysis identifies inefficiencies before
implementing corrective financial actions.
Question 3
A hospital laboratory reports inconsistent turnaround times for test results.
What is MOST effective?
,A. Increase sample backlog
B. Standardize workflows and introduce automation systems
C. Reduce testing services
D. Outsource all testing immediately
Correct Answer: B
Rationale: Standardization and automation reduce variability and delays.
Question 4
A hospital frequently experiences shortages of critical supplies. What is
BEST solution?
A. Emergency procurement only
B. Predictive inventory management system with forecasting
C. Reduce inventory categories
D. Order manually when stock runs out
Correct Answer: B
Rationale: Forecasting ensures proactive supply availability and
prevents shortages.
Question 5
A hospital outpatient clinic has long patient queues. What is BEST
intervention?
A. Reduce appointments
B. Optimize scheduling and patient flow design
C. Eliminate walk-in patients
D. Increase paperwork requirements
Correct Answer: B
Rationale: Flow optimization reduces congestion and waiting times.
Question 6
A hospital adopts Lean Six Sigma. What is the MAIN goal?
A. Increase process variation
B. Reduce waste and process defects
, C. Increase staffing levels
D. Increase reporting delays
Correct Answer: B
Rationale: Lean Six Sigma focuses on eliminating waste and improving
quality.
Question 7
A hospital has inefficient operating theatre utilization. What is MOST
effective?
A. Reduce surgeries
B. Centralized OR scheduling optimization system
C. Close unused theatres permanently
D. Allow uncoordinated surgeon scheduling
Correct Answer: B
Rationale: Central scheduling improves efficiency and utilization.
Question 8
A healthcare facility experiences frequent equipment downtime. What is
BEST?
A. Reactive maintenance
B. Preventive maintenance system
C. Replace all equipment
D. Ignore failure trends
Correct Answer: B
Rationale: Preventive maintenance reduces breakdowns and downtime.
Question 9
A hospital has delayed discharge processes. What is BEST?
A. Delay discharge approvals
B. Multidisciplinary discharge coordination team
C. Reduce documentation
D. Increase admissions