• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

NCCCO tower crane Exam Newest 2025 Complete Questions And Correct Detailed Answers (Verified Answers)_Already Graded A+ Flashcards _ Quizlet.pdf

Document preview thumbnail
Preview 3 out of 16 pages

NCCCO tower crane Exam Newest 2025 Complete Questions And Correct Detailed Answers (Verified Answers)_Already Graded A+ Flashcards _ Q

Content preview

NCCCO tower crane Exam Newest 2025 Complete Questions And Correct
Detailed Answers (Verified Answers)_Already Graded A+




Splices in rall tracks shall have - (ANSWER)Smooth Joints



Hydraulic systems should have their proper fluid level checked - (ANSWER)Daily



If power fails during operations, the following shouldn't apply - (ANSWER)Do your best to finish moving
load where it was designated to go



If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which
the load is to be lifted - (ANSWER)Person responsible for lift



Where should climbing instructions be kept - (ANSWER)ON Site



All climbing operations shall be performed under the supervision of - (ANSWER)Qualified person



When cranes are erected, load limiting devices shall be tested for proper setting and operation -
(ANSWER)Before crane is placed in service



Hooks shall be equipped with latches unless the application makes the use of the latch -
(ANSWER)Impractical



Size and position of signs or panels must satisfy the limitations of - (ANSWER)Manufacturer



Fall prevention measures are needed for working at locations where you are exposed - (ANSWER)To a
fall of 6ft or more



Travel distance on hand levers shall not be greater - (ANSWER)than 14 inches from neutral position

,NCCCO tower crane Exam Newest 2025 Complete Questions And Correct
Detailed Answers (Verified Answers)_Already Graded A+




For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load
is - (ANSWER)15ft



All controls shall be tested by the operator at the - (ANSWER)start of new shift



Before each climbing operation all load members of the support system shall be - (ANSWER)Inspected



Chain slings are required to be - (ANSWER)ID tagged



Welding on loads suspended by the crane can only be done if the load has - (ANSWER)Insulated slings



How much does an average cubic yard of concrete weight - (ANSWER)4,000 lbs



Main power switch for tower crane is - (ANSWER)At base of crane



Items not listed in the frequent inspection checklist are - (ANSWER)Hydraulic pumps and valves for
excessive wear or damage



When is it necessary to determine that there is no practical alternative way to perform the needed work
or to gain access to the area - (ANSWER)Personnel Lift



Each series of voice signals shall contain three elements stated in the following order -
(ANSWER)Function and Direction - Distance and speed - Function stop



When lifting personnel communication shall be maintained between three of the next four -
(ANSWER)Person(s) being lifted - Operator - Signal person

, NCCCO tower crane Exam Newest 2025 Complete Questions And Correct
Detailed Answers (Verified Answers)_Already Graded A+




The condition when the tower load block or hook assembly comes in contact with the upper -
(ANSWER)Two-blocking



Load bearing members of the climbing and support system shall be inspected before each -
(ANSWER)Climbing operation



Where shall a wind velocity indicating device be mounted - (ANSWER)At or near the top of crane



A velocity readout shall be provided - (ANSWER)At the operators station



The area inside the self erecting tower cranes tail swing must be - (ANSWER)Barricaded



The self erecting tower crane must be properly grounded according with the - (ANSWER)National
electric code (NEC)



Self Erecting tower crane erection must be performed by - (ANSWER)Qualified person



Extensive planning must occur before a self erecting tower crane arrives on the job site. The plan should
be divided into two major sections as follows - (ANSWER)Delivery, set up, erection and dismantle -
Lifting operations



According to ASME B30.3 the minimum wraps to be left on a hoist drum are - (ANSWER)3



How much does a cubic foot of steel weigh - (ANSWER)490lbs



When operating a tower crane and there is an uncontrolled movement, the operator should -
(ANSWER)Engage emergency stop

Document information

Uploaded on
June 16, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VstarPlug
4.9
(285)
Sold
1325
Followers
2
Items
1217
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions