DBIA® CERTIFIED DESIGN-BUILD PROFESSIONAL EXAM PREP QUESTIONS COMPLETE WITH VERIFIED ANSWERS AND DETAILED EXPLANATIONS

Document preview thumbnail
Preview 4 out of 123 pages

DBIA® CERTIFIED DESIGN-BUILD PROFESSIONAL EXAM PREP QUESTIONS COMPLETE WITH VERIFIED ANSWERS AND DETAILED EXPLANATIONS 1. Which of the following best defines a “best value” selection in Design-Build procurement? A) Awarding to the lowest priced proposal regardless of qualifications B) Awarding based solely on past performance C) Awarding based on a balanced evaluation of price and qualitative factors (e.g., technical approach, key personnel, schedule) [] D) Selecting the contractor with the largest bonding capacity Explanation: Best value procurement combines cost and technical criteria to determine the most advantageous offer. DBIA emphasizes best value to optimize project outcomes, not just lowest first cost. Qualitative factors typically include design excellence, management plan, past performance, and schedule. ________________________________________ 2. Under a Design-Build contract, who typically bears the risk of differing site conditions that are not reasonably foreseeable? A) Owner B) Design-Builder C) Owner [] D) Subcontractor Explanation: Unlike traditional design-bid-build where contractor bears differing site conditions risk only if contract says so, DB contracts often place foreseeable geotechnical risks on DB but unforeseeable conditions risk usually remains with the owner because the DB cannot fully investigate before pricing. DBIA best practices recommend a “changed conditions” clause. ________________________________________ **3. The DBIA’s “Design-Build Done Right®” emphasizes that the owner’s request for proposals (RFP) should be based on: A) Complete 100% construction documents B) Performance criteria and conceptual design only [] C) Lowest price guarantee D) Turnkey financing Explanation: DBIA’s foundational principle is that the owner provides performance criteria (what is needed) not detailed specifications (how to build). This allows the DB team to innovate and optimize design and construction. ________________________________________ 4. Which procurement method features single-point responsibility for both design and construction but allows design to progress in phases as construction begins? A) Construction Manager at Risk (CMAR) B) Design-Bid-Build C) Design-Build [] D) Multiple Prime Contracts Explanation: Design-Build’s hallmark is single entity responsibility and fast-tracking (overlapping design and construction). CMAR has early CM involvement but design is still separate; DBB is linear. Multiple primes fragment responsibility. ________________________________________ **5. When the owner provides only a conceptual design (10–15% complete) and asks for a fixed price with performance specs, the most appropriate delivery method is: A) Integrated Project Delivery (IPD) B) Design-Build [] C) Job Order Contracting (JOC) D) Construction Management Multi-Prime Explanation: DB is ideal when owner has high-level requirements but wants a single contract for design and construction with price certainty early. IPD requires multi-party risk/reward sharing; JOC is for small repetitive work. ________________________________________ **6. In a DB contract, if the Design-Builder fails to achieve the specified performance criteria (e.g., energy efficiency standard), the likely remedy is: A) Owner must accept non-performance B) Corrective work at DB’s expense, potential liquidated damages, or replacement [] C) Share of savings D) Renegotiate criteria Explanation: Design-Build contracts require the DB to meet all performance criteria. Failure constitutes breach; typical remedies include repair/replacement, liquidated damages, or termination for cause. Owner does not accept substandard performance. ________________________________________ 7. Which risk allocation principle does DBIA recommend for control and influence? A) The party best able to bear the risk should bear it B) The party best able to control or influence the risk outcome should bear it [] C) The owner bears all risks D) The Design-Builder bears all risks Explanation: DBIA’s risk allocation guidelines state risk should be assigned to the party most capable of controlling the risk event. For example, DB controls means/methods risk; owner controls scope change risk. Not just ability to pay (bear) but ability to influence. ________________________________________ **8. A “progressive Design-Build” differs from “fixed-price Design-Build” primarily because: A) Price is fully determined before any design B) Design-Builder is selected early based on qualifications, then price is negotiated after design development [] C) It requires three separate contracts D) Owner acts as designer

Content preview

DBIA® CERTIFIED DESIGN-BUILD PROFESSIONAL
EXAM PREP QUESTIONS COMPLETE WITH
VERIFIED ANSWERS AND DETAILED
EXPLANATIONS




1. Which of the following best defines a “best value” selection in
Design-Build procurement?
A) Awarding to the lowest priced proposal regardless of qualifications
B) Awarding based solely on past performance
C) Awarding based on a balanced evaluation of price and qualitative
factors (e.g., technical approach, key personnel, schedule) [✔]
D) Selecting the contractor with the largest bonding capacity
Explanation: Best value procurement combines cost and technical
criteria to determine the most advantageous offer. DBIA emphasizes
best value to optimize project outcomes, not just lowest first cost.
Qualitative factors typically include design excellence, management
plan, past performance, and schedule.


2. Under a Design-Build contract, who typically bears the risk of
differing site conditions that are not reasonably foreseeable?
A) Owner
B) Design-Builder

,C) Owner [✔]
D) Subcontractor
Explanation: Unlike traditional design-bid-build where contractor bears
differing site conditions risk only if contract says so, DB contracts often
place foreseeable geotechnical risks on DB
but unforeseeable conditions risk usually remains with the owner
because the DB cannot fully investigate before pricing. DBIA best
practices recommend a “changed conditions” clause.


**3. The DBIA’s “Design-Build Done Right®” emphasizes that the
owner’s request for proposals (RFP) should be based on:
A) Complete 100% construction documents
B) Performance criteria and conceptual design only [✔]
C) Lowest price guarantee
D) Turnkey financing
Explanation: DBIA’s foundational principle is that the owner
provides performance criteria (what is needed) not detailed
specifications (how to build). This allows the DB team to innovate and
optimize design and construction.


4. Which procurement method features single-point responsibility for
both design and construction but allows design to progress in phases
as construction begins?
A) Construction Manager at Risk (CMAR)
B) Design-Bid-Build

,C) Design-Build [✔]
D) Multiple Prime Contracts
Explanation: Design-Build’s hallmark is single entity responsibility
and fast-tracking (overlapping design and construction). CMAR has
early CM involvement but design is still separate; DBB is linear. Multiple
primes fragment responsibility.


**5. When the owner provides only a conceptual design (10–15%
complete) and asks for a fixed price with performance specs, the most
appropriate delivery method is:
A) Integrated Project Delivery (IPD)
B) Design-Build [✔]
C) Job Order Contracting (JOC)
D) Construction Management Multi-Prime
Explanation: DB is ideal when owner has high-level requirements but
wants a single contract for design and construction with price certainty
early. IPD requires multi-party risk/reward sharing; JOC is for small
repetitive work.


**6. In a DB contract, if the Design-Builder fails to achieve the specified
performance criteria (e.g., energy efficiency standard), the likely
remedy is:
A) Owner must accept non-performance
B) Corrective work at DB’s expense, potential liquidated damages, or
replacement [✔]

, C) Share of savings
D) Renegotiate criteria
Explanation: Design-Build contracts require the DB to meet all
performance criteria. Failure constitutes breach; typical remedies
include repair/replacement, liquidated damages, or termination for
cause. Owner does not accept substandard performance.


7. Which risk allocation principle does DBIA recommend for control
and influence?
A) The party best able to bear the risk should bear it
B) The party best able to control or influence the risk outcome should
bear it [✔]
C) The owner bears all risks
D) The Design-Builder bears all risks
Explanation: DBIA’s risk allocation guidelines state risk should be
assigned to the party most capable of controlling the risk event. For
example, DB controls means/methods risk; owner controls scope
change risk. Not just ability to pay (bear) but ability to influence.


**8. A “progressive Design-Build” differs from “fixed-price Design-Build”
primarily because:
A) Price is fully determined before any design
B) Design-Builder is selected early based on qualifications, then price
is negotiated after design development [✔]
C) It requires three separate contracts
D) Owner acts as designer

Document information

Uploaded on
June 15, 2026
Number of pages
123
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
maingirose
4.3
(4)
Sold
26
Followers
0
Items
1774
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions