Which of the following is a quick method to verify that the programmable controller itself is
operating correctly? - ANSWER Solid Green Light
What does an operator interact with on a HMI panel to monitor process and make
adjustments to keep the process running? - ANSWER Object
What device is used to configure an HMI panel IP address? - ANSWER USB
Pressing the E-Stop button on a PLC master control relay circuit causes power to be removed
from what components? - ANSWER Output Module
Which IP address - ANSWER 192.--.15
What is the value contained in the RESULTS tag? - ANSWER 2
What trigger for a time driven sequencing process to move to the next? - ANSWER .DN
What type of instructions are used to make decisions and control operations based on the
values of data in PLC program? - ANSWER Comparison Instructions
What software configuration element identifies the actual physical location of an input
terminal of a PLC input module? - ANSWER Absolute address
If a 24 VDC PLC input module uses sinking type (active high) inputs, what applied voltage
level would cause the input to turn on? - ANSWER +24V
1
, A PLC and a PC are connected in this type of network if a single Ethernet cable is used to
connect their Ethernet parts - ANSWER IP addresses are similar
What term is used to describe these functions in PLC programming: adding and removing
instructions, changing logic of change addresses? - ANSWER Edit
What is a collection of files that includes a PLC ladder logic program, hardware configuration
and settings? - ANSWER Project
What are software programs called that allow a device to connect a network and
communicate with other devices? - ANSWER Drivers
Which of these wiring connections are required to wire a limit switch to input 3 of the
sinking input module? - ANSWER C to A, B to G, H to D
What step do PLC scan cycles perform after checking the status of inputs and solving
program logic? - ANSWER Turn on output
What networks configuration settings must be configured correctly to enable
communication between PLC and PC? - ANSWER Point to Point
In the logic diagram, what input conditions will cause output M1 to turn on? - ANSWER
PB1 True, PB2 True, PB3 False
What is the next step to enter ladder logic after the programs editor has been opened and
an empty rung is in its place? - ANSWER Add instructions
2
operating correctly? - ANSWER Solid Green Light
What does an operator interact with on a HMI panel to monitor process and make
adjustments to keep the process running? - ANSWER Object
What device is used to configure an HMI panel IP address? - ANSWER USB
Pressing the E-Stop button on a PLC master control relay circuit causes power to be removed
from what components? - ANSWER Output Module
Which IP address - ANSWER 192.--.15
What is the value contained in the RESULTS tag? - ANSWER 2
What trigger for a time driven sequencing process to move to the next? - ANSWER .DN
What type of instructions are used to make decisions and control operations based on the
values of data in PLC program? - ANSWER Comparison Instructions
What software configuration element identifies the actual physical location of an input
terminal of a PLC input module? - ANSWER Absolute address
If a 24 VDC PLC input module uses sinking type (active high) inputs, what applied voltage
level would cause the input to turn on? - ANSWER +24V
1
, A PLC and a PC are connected in this type of network if a single Ethernet cable is used to
connect their Ethernet parts - ANSWER IP addresses are similar
What term is used to describe these functions in PLC programming: adding and removing
instructions, changing logic of change addresses? - ANSWER Edit
What is a collection of files that includes a PLC ladder logic program, hardware configuration
and settings? - ANSWER Project
What are software programs called that allow a device to connect a network and
communicate with other devices? - ANSWER Drivers
Which of these wiring connections are required to wire a limit switch to input 3 of the
sinking input module? - ANSWER C to A, B to G, H to D
What step do PLC scan cycles perform after checking the status of inputs and solving
program logic? - ANSWER Turn on output
What networks configuration settings must be configured correctly to enable
communication between PLC and PC? - ANSWER Point to Point
In the logic diagram, what input conditions will cause output M1 to turn on? - ANSWER
PB1 True, PB2 True, PB3 False
What is the next step to enter ladder logic after the programs editor has been opened and
an empty rung is in its place? - ANSWER Add instructions
2