MKC SWE Exam | Questions and Answers |
Verified Solutions | 2026 Edition | Pass
Guaranteed
Save
Terms in this set (307)
TCTO Technical Change Training Order
Non-Self Righting Small Boats less Changes that create more than a 0.002 ft change in
than 65 feet in length for the center of gravity in any direction (vertical,
longitudal or transverse) or net weight changes of
more than 1/5 of 1% of the full load displacement
All other Assets require TCTO for Changes that create more than a 0.001 ft change in
center of gravity (vertical, long, trans) or net weight
changes of more than 1/20 of 1% of the full load
displacement require TCTO.
Weight Change Threshold 1/5 of 1% of full load displacement for small boats.
TCTO Requirement for Other Assets 0.001 ft center of gravity change triggers TCTO.
Changes to hull structure, space TCTO
allocation, watertight integrity or
compartmentation require
Change to any system that affects TCTO
spare parts allowance require
, Fluid or Paint System Changes TCTO
require
Changes that require TCTO
Electromagnetic Compatibility EMC
or TEMPEST Inspection require
Form fit or function changes require TCTO
Changes in software MODS require TCTO
All cutter and boats operating Every hour and reading shall be recorded
machine machinery, Shelby
inspected how often
How often do cutters equipped with Every 4 hours
video and electronic control systems
that monitor space is for fire and
flooding need to be inspected
How often should machine Every four hours
machinery be checked in port?
How often should Electrical short During the hours of 6 AM to 10 PM
ties be inspected?
All propulsion machinery shall be Main engine start, warm up, securing, and during
attended during other than normal operating conditions
Verified Solutions | 2026 Edition | Pass
Guaranteed
Save
Terms in this set (307)
TCTO Technical Change Training Order
Non-Self Righting Small Boats less Changes that create more than a 0.002 ft change in
than 65 feet in length for the center of gravity in any direction (vertical,
longitudal or transverse) or net weight changes of
more than 1/5 of 1% of the full load displacement
All other Assets require TCTO for Changes that create more than a 0.001 ft change in
center of gravity (vertical, long, trans) or net weight
changes of more than 1/20 of 1% of the full load
displacement require TCTO.
Weight Change Threshold 1/5 of 1% of full load displacement for small boats.
TCTO Requirement for Other Assets 0.001 ft center of gravity change triggers TCTO.
Changes to hull structure, space TCTO
allocation, watertight integrity or
compartmentation require
Change to any system that affects TCTO
spare parts allowance require
, Fluid or Paint System Changes TCTO
require
Changes that require TCTO
Electromagnetic Compatibility EMC
or TEMPEST Inspection require
Form fit or function changes require TCTO
Changes in software MODS require TCTO
All cutter and boats operating Every hour and reading shall be recorded
machine machinery, Shelby
inspected how often
How often do cutters equipped with Every 4 hours
video and electronic control systems
that monitor space is for fire and
flooding need to be inspected
How often should machine Every four hours
machinery be checked in port?
How often should Electrical short During the hours of 6 AM to 10 PM
ties be inspected?
All propulsion machinery shall be Main engine start, warm up, securing, and during
attended during other than normal operating conditions