CMGT Final 8 Study Guide, Practice Questions and Complete Exam Review 2026
office communication structure - ANS ✔✔what is NOT one of the three main issues the
superintendent must be concerned with when trying to manage construction operations
try to fit as many subcontractors into the same space at the same time to cut back on duration -
ANS ✔✔when scheduling subcontractors for the job, you should try to follow three
fundamental rules. which of the following is NOT one of them?
confirming an order day-of delivery that has been placed prior - ANS ✔✔what does it mean to
order something on will-call?
on site meetings with the owner - ANS ✔✔which is NOT a factor that negatively impacts
construction productivity?
discovering historial or cultural artifacts while excavating - ANS ✔✔what is an environmental
issue that would interfere with the project schedule and cause unexpected delays on the job?
a designated storage area on site used for sorting out large orders - ANS ✔✔what is a laydown
area?
a site logistics plan - ANS ✔✔on what kind of plan would a portable toilet, dumpsters, and on-
site parking areas be shown?
the diaries help to keep straight all of the communications, conversations, and activities - ANS
✔✔why is it important for the job superintendent and the other members of the onsite team to
keep project diaries?
office communication structure - ANS ✔✔what is NOT one of the three main issues the
superintendent must be concerned with when trying to manage construction operations
try to fit as many subcontractors into the same space at the same time to cut back on duration -
ANS ✔✔when scheduling subcontractors for the job, you should try to follow three
fundamental rules. which of the following is NOT one of them?
confirming an order day-of delivery that has been placed prior - ANS ✔✔what does it mean to
order something on will-call?
on site meetings with the owner - ANS ✔✔which is NOT a factor that negatively impacts
construction productivity?
discovering historial or cultural artifacts while excavating - ANS ✔✔what is an environmental
issue that would interfere with the project schedule and cause unexpected delays on the job?
a designated storage area on site used for sorting out large orders - ANS ✔✔what is a laydown
area?
a site logistics plan - ANS ✔✔on what kind of plan would a portable toilet, dumpsters, and on-
site parking areas be shown?
the diaries help to keep straight all of the communications, conversations, and activities - ANS
✔✔why is it important for the job superintendent and the other members of the onsite team to
keep project diaries?