What is the cap for price-based offers? - correct-answer -Price-based offers will
be capped at the lower of $2000/MWh or the corresponding cost-based offer
when costs are above $1000/MWh
Example:
If a unit's cost is $1500, the price offer can be no higher than $1500
If $800, price offer can be no higher than $1000
If $2200, price offer can be no higher than $2000
Real time real and reactive power telemetry: Generators participating in the PJM
market as... - correct-answer -capacity resources
,2|Page
Real time real and reactive power telemetry: Generators __ MW (Maximum
facility output) or larger - correct-answer -10MW
Real time real and reactive power telemetry: Generators greater than __ MW
(Maximum facility output) and connected at a bus operating at __ kV or greater -
correct-answer -1MW; 50 kV
Real time real and reactive power telemetry: Solar parks __MW (Maximum
Facility Output) or greater - correct-answer -3 MW
Real time real and reactive power telemetry: Distributed generators modeled less
than __ MW (Maximum Facility Output) - correct-answer -10 MW
, 3|Page
Real time real and reactive power telemetry: Public... - correct-answer -
Distribution Microgrid Generators
Real time real and reactive power telemetry: Generators that will also participate
as PJM _____________ when they will reduce load and have PJM-approved
interconnection rights to inject power. - correct-answer -Demand Response
Resources
What are the real-time data requirements for a Mixed Technology Facility that is
directly connected to PJM transmission and has a Maximum Facility Output of
75MW or greater, or otherwise is a BES generator? - correct-answer -MW and
MVAR must be measured at the high-side of the generator step-up transformer. If
the transformer is modeled in the PJM EMS (e.g., for units 20MW and greater),
MW and MVAR must also be measured at the low-side of the generator step-up
transformer
PJM GENERATION OPERATION EXAM
|COMPREHENSIVE Q&A FOR
CERTIFICATION SUCCERSS
What is the cap for price-based offers? - correct-answer -Price-based offers will
be capped at the lower of $2000/MWh or the corresponding cost-based offer
when costs are above $1000/MWh
Example:
If a unit's cost is $1500, the price offer can be no higher than $1500
If $800, price offer can be no higher than $1000
If $2200, price offer can be no higher than $2000
Real time real and reactive power telemetry: Generators participating in the PJM
market as... - correct-answer -capacity resources
,2|Page
Real time real and reactive power telemetry: Generators __ MW (Maximum
facility output) or larger - correct-answer -10MW
Real time real and reactive power telemetry: Generators greater than __ MW
(Maximum facility output) and connected at a bus operating at __ kV or greater -
correct-answer -1MW; 50 kV
Real time real and reactive power telemetry: Solar parks __MW (Maximum
Facility Output) or greater - correct-answer -3 MW
Real time real and reactive power telemetry: Distributed generators modeled less
than __ MW (Maximum Facility Output) - correct-answer -10 MW
, 3|Page
Real time real and reactive power telemetry: Public... - correct-answer -
Distribution Microgrid Generators
Real time real and reactive power telemetry: Generators that will also participate
as PJM _____________ when they will reduce load and have PJM-approved
interconnection rights to inject power. - correct-answer -Demand Response
Resources
What are the real-time data requirements for a Mixed Technology Facility that is
directly connected to PJM transmission and has a Maximum Facility Output of
75MW or greater, or otherwise is a BES generator? - correct-answer -MW and
MVAR must be measured at the high-side of the generator step-up transformer. If
the transformer is modeled in the PJM EMS (e.g., for units 20MW and greater),
MW and MVAR must also be measured at the low-side of the generator step-up
transformer