What does IMA stand for?
Give this one a try later!
Intermediate Maintenance Activity
In the "Procedure" block, Work Center Supervisors may line out the non-applicable
line items (alternate procedures) that do not pertain to current
equipment/configuration when the step is followed with the words "if applicable" or a
note identifying steps to be omitted. These items must be reviewed and initialed by
whom?
Give this one a try later!
, Division Leading Chief Petty Officer
Who has the responsibility for establishing a climate where PMS accomplishment is a
command wide priority and where command leadership is familiar with 3-M program
requirements?
Give this one a try later!
CO
What is designed to provide a ready reference of planned maintenance requirements
which will be retained in the working area for use by the Work Center Supervisor and
maintenance personnel?
Give this one a try later!
Work Center PMS Manual
Which of the following is one of the primary 3M responsibilities of the Department
Head?
Give this one a try later!
Review and or approve alert details along with check notes/flip page
reports
,MIPs/MRCs not scheduled that are required are called .......
Give this one a try later!
Omitted
How do you verify the MRC?
Give this one a try later!
By the MRC Syscom number and periodicity code.
2 types of tagouts?
Give this one a try later!
DANGER & CAUTION
What does TGL stand for?
Give this one a try later!
Tag Guide List
, CSMP
Give this one a try later!
Current Ship's Maintenance Project
What are the three categories of periodicities?
Give this one a try later!
Calendar, Non-calendar, and Inactive Equipment Maintenance
Which of the following are NOT identification markers on shipboard HAZMAT
containers?
Give this one a try later!
SYSCOM Control Number
LCPO role
Give this one a try later!
Places workcenter in revision, initials all line-outs
Give this one a try later!
Intermediate Maintenance Activity
In the "Procedure" block, Work Center Supervisors may line out the non-applicable
line items (alternate procedures) that do not pertain to current
equipment/configuration when the step is followed with the words "if applicable" or a
note identifying steps to be omitted. These items must be reviewed and initialed by
whom?
Give this one a try later!
, Division Leading Chief Petty Officer
Who has the responsibility for establishing a climate where PMS accomplishment is a
command wide priority and where command leadership is familiar with 3-M program
requirements?
Give this one a try later!
CO
What is designed to provide a ready reference of planned maintenance requirements
which will be retained in the working area for use by the Work Center Supervisor and
maintenance personnel?
Give this one a try later!
Work Center PMS Manual
Which of the following is one of the primary 3M responsibilities of the Department
Head?
Give this one a try later!
Review and or approve alert details along with check notes/flip page
reports
,MIPs/MRCs not scheduled that are required are called .......
Give this one a try later!
Omitted
How do you verify the MRC?
Give this one a try later!
By the MRC Syscom number and periodicity code.
2 types of tagouts?
Give this one a try later!
DANGER & CAUTION
What does TGL stand for?
Give this one a try later!
Tag Guide List
, CSMP
Give this one a try later!
Current Ship's Maintenance Project
What are the three categories of periodicities?
Give this one a try later!
Calendar, Non-calendar, and Inactive Equipment Maintenance
Which of the following are NOT identification markers on shipboard HAZMAT
containers?
Give this one a try later!
SYSCOM Control Number
LCPO role
Give this one a try later!
Places workcenter in revision, initials all line-outs