When handling steel framing members, you should wear
specific gloves to protect against cuts.
a. True
b. False - Answer-a. True
The universal designator system for steel framing
materials is called the ____.
a. FMIS system
b. S-T-U-F system
c. SSID system
d. STMF system - Answer-b. S-T-U-F system
To attach OSB sheathing to steel framing, you would use a
_____.
a. drywall screwgun
b. hammer drill
c. screwdriver
,2|Page
d. powder-actuated tool - Answer-a. drywall screwgun
The number of cold-formed steel studs required for a
building measuring 50' x 75' is _____.
a. 50
b. 75
c. 125
d. 250 - Answer-d. 250
In in-line framing, framing members are aligned vertically
so the center line of the joist web and center line of the
structural stud is within _____.
a. 3/4"
b. 4"
c. 8"
d. 36" - Answer-a. 3/4"
When assembling a structural steel-framed wall, the
maximum allowable gap between stud and track is
______.
a. 1/8"
, 3|Page
b. 1/4"
c. 1/2"
d. 3/4" - Answer-a. 1/8"
In wall framing, the normal spacing for steel studs is ____.
a. 16" on center
b. 16" apart
c. 24" apart
d. 24" on center - Answer-d. 24" on center
Steel roof trusses are _______.
a. seldom used today
b. durable and noncombustible
c. difficult to erect
d. available only as a standard C-shape members -
Answer-b. durable and noncombustible
In a ceiling system using steel members, gypsum board is
attached with ____.
a. bolts
b. wire ties
CSA S136 Cold-Formed Steel Structural Members
Exam Practice Questions And Correct
Answers||Verified Exam!! (Verified Answers) Plus
Rationale 2026/2027 Q&A| Instant Download Pdf
When handling steel framing members, you should wear
specific gloves to protect against cuts.
a. True
b. False - Answer-a. True
The universal designator system for steel framing
materials is called the ____.
a. FMIS system
b. S-T-U-F system
c. SSID system
d. STMF system - Answer-b. S-T-U-F system
To attach OSB sheathing to steel framing, you would use a
_____.
a. drywall screwgun
b. hammer drill
c. screwdriver
,2|Page
d. powder-actuated tool - Answer-a. drywall screwgun
The number of cold-formed steel studs required for a
building measuring 50' x 75' is _____.
a. 50
b. 75
c. 125
d. 250 - Answer-d. 250
In in-line framing, framing members are aligned vertically
so the center line of the joist web and center line of the
structural stud is within _____.
a. 3/4"
b. 4"
c. 8"
d. 36" - Answer-a. 3/4"
When assembling a structural steel-framed wall, the
maximum allowable gap between stud and track is
______.
a. 1/8"
, 3|Page
b. 1/4"
c. 1/2"
d. 3/4" - Answer-a. 1/8"
In wall framing, the normal spacing for steel studs is ____.
a. 16" on center
b. 16" apart
c. 24" apart
d. 24" on center - Answer-d. 24" on center
Steel roof trusses are _______.
a. seldom used today
b. durable and noncombustible
c. difficult to erect
d. available only as a standard C-shape members -
Answer-b. durable and noncombustible
In a ceiling system using steel members, gypsum board is
attached with ____.
a. bolts
b. wire ties