Contracting Practice Exam Questions
And Answers Rated A+ New Update
Assured Satisfaction Instant Download
1. Which of the following is the primary federal regulation governing VA contracting for
alternative energy systems?
A) EPA Clean Air Act
B) FAR Part 23 – Environment, Energy, and Water Efficiency
C) DOE Loan Guarantee Program
D) OSHA 1926 Subpart P
Answer: B
Explanation: FAR Part 23 specifically addresses environmental, energy, and water
efficiency, including requirements for alternative energy systems in federal contracts. The
VA follows FAR and its supplement VAAR.
2. Under the VA’s Green Management Program, alternative energy systems must
comply with which energy performance standard?
A) ASHRAE 90.1
B) IECC 2015
C) EPAct 2005
D) All of the above
Answer: D
Explanation: VA contracts require compliance with ASHRAE 90.1, IECC, and the Energy
Policy Act of 2005 for energy efficiency and renewable energy integration.
,3. What is the VA’s preferred contracting method for large-scale solar photovoltaic
installations?
A) Firm-fixed-price (FFP)
B) Cost-plus-percentage-of-cost
C) Time-and-materials
D) Indefinite delivery/indefinite quantity (IDIQ) with task orders
Answer: D
Explanation: For large-scale solar, the VA often uses IDIQ contracts to allow flexible task
orders for multiple sites, leveraging economies of scale.
4. Which clause must be included in VA alternative energy contracts exceeding the
micro-purchase threshold?
A) FAR 52.223-1, Biobased Product Certification
B) FAR 52.223-2, Affirmative Procurement of Biobased Products
C) FAR 52.223-10, Waste Reduction Program
D) FAR 52.223-15, Energy Efficiency in Energy-Consuming Products
Answer: D
*Explanation: FAR 52.223-15 requires contractors to provide energy-efficient products,
essential for alternative energy systems like inverters and batteries.*
5. A VA medical center seeks a geothermal heat pump system. Which NAICS code is
most appropriate?
A) 221114 – Solar Electric Power Generation
B) 238220 – Plumbing, Heating, and Air-Conditioning Contractors
C) 333415 – Air-Conditioning and Warm Air Heating Equipment Manufacturing
D) 541330 – Engineering Services
Answer: B
Explanation: Installation of geothermal heat pumps falls under NAICS 238220, as it
involves HVAC contracting services, not just equipment supply.
6. What is the maximum period of performance for a VA energy savings performance
contract (ESPC) without special approval?
,A) 10 years
B) 15 years
C) 25 years
D) 30 years
Answer: C
Explanation: Under ESPC authorities (42 U.S.C. 8287), federal agencies including VA can
contract for up to 25 years to finance energy improvements from savings.
7. Which of the following is NOT a valid alternative energy source for VA contracts
under EPAct 2005?
A) Solar thermal
B) Municipal solid waste incineration without energy recovery
C) Wind
D) Landfill gas
Answer: B
*Explanation: EPAct 2005 recognizes waste-to-energy only if energy is recovered;
incineration without recovery is not considered alternative energy.*
8. The VA requires that at least what percentage of a building’s energy use come from
renewable sources for new construction contracts over $5 million?
A) 5%
B) 10%
C) 15%
D) 20%
**Answer: B**
*Explanation: VA Directive 0052 and Executive Order 14057 mandate 10% renewable
energy for new federal buildings over $5M, phased to higher targets.*
9. In a VA tender for battery energy storage systems (BESS), which safety standard is
mandatory?
A) UL 9540
B) IEEE 1547
, C) NFPA 855
D) All of the above
Answer: D
Explanation: UL 9540 (system safety), IEEE 1547 (grid interconnection), and NFPA 855
(installation) are all required in VA BESS contracts.
10. A contractor proposing a wind turbine at a VA facility must submit an avian and bat
impact study under which law?
A) Endangered Species Act
B) Migratory Bird Treaty Act
C) National Environmental Policy Act (NEPA)
D) Clean Water Act
Answer: C
Explanation: NEPA requires environmental assessments for federal actions; avian impacts
are part of that, though MBTA also applies indirectly.
11. The VA’s contractor performance evaluation for alternative energy systems includes
a specific metric for:
A) Mean time between failures (MTBF) of inverters
B) Color of solar panels
C) Contractor’s office location
D) Number of subcontractors
Answer: A
Explanation: Reliability metrics like MTBF are critical for VA’s energy resilience; aesthetics
are secondary, location and subcount not primary.
12. Which FAR part governs acquisition of utility services for VA alternative energy
projects?
A) FAR Part 36 – Construction
B) FAR Part 41 – Acquisition of Utility Services
C) FAR Part 12 – Commercial Items
D) FAR Part 8 – Required Sources