Certified erosion sediment and stormwater inspector - CORRECT ANSWER - CESSWI
MS4 - CORRECT ANSWER - Municipal Separate Storm Sewer System
ESCP - CORRECT ANSWER - Erosion and sediment control plan
Has regulatory authority over the cwa - CORRECT ANSWER - EPA
Only directly to. Or though a separate storm water system into us waters only - CORRECT
ANSWER - NPDES REQUIREMENTS
Commercial, retail, light industrial and institutional facilities.
Less than 5 acres
MS4 serving fewer than 100k people - CORRECT ANSWER - Phase II
Agriculture is exempt only for - CORRECT ANSWER - Crop production
Triennial review process - CORRECT ANSWER - States required to review and revise if
necessary
, Umbrella coverage - CORRECT ANSWER - General Permit
Identifies potential sources of pollution that may effect storm water discharges.
Describes management practices that are to be implemented to reduce pollutants discharges in
stormwater - CORRECT ANSWER - SWPPP
Offers no mitigation - CORRECT ANSWER - Ignorance
Controls water pollution by regulating point sources that discharge pollutants into waters of the
US - CORRECT ANSWER - NPDES National pollutant discharge elimination system
Return flow from irrigated agriculture or their run off - CORRECT ANSWER - Does not apply
to the storm water term
O&G, forestry, and agriculture discharges are - CORRECT ANSWER - Exempt
Waiver "construction rainfall erosivity waiver" from phase II requirements under 2 conditions -
CORRECT ANSWER - Low rainfall potential
Based on TMDL
*only for small sites
NOI - CORRECT ANSWER - Brief description of project
Estimated timetable for major activities
Estimated disturbed acres of soil
Certification that the swppp provides compliance