●● 60 days.
Answer: Deadline to file a lien after a "notice of completion" is filed.
A.R.S. § 33-993(A)
●● 120 days.
Answer: Deadline to file a lien after "completion," if a notice of
completion is not filed. A.R.S. § 33-993(A
●● 6 months.
Answer: Deadline for enforcing a lien (by filing a lawsuit).
●● 10 days.
Answer: Deadline to dispute a lien after notice of owner's intent to retain
payment for the lien from payment to the contractor. A.R.S. § 33-994
●● 20 days.
, Answer: Deadline for releasing a lien that has been paid in full or
following written request, to avoid owing penalties and damages. A.R.S.
§ 33-1006
●● a contractor license is required when the total cost, including
materials is more than.
Answer: $1000
●● which state agency has the authority to issue a contractor license.
Answer: ROC
●● what is the role of the ROC.
Answer: ALL OF THE ABOVE
●● if you have a B- general license which of the items below must be
subcontracted ?.
Answer: all of the above
-repairing an hvac
-installing a pool
-wiring a homes electrical circuit
COMPREHENSIVE EXAM 2026 FULL
QUESTIONS AND CORRECT ANSWERS
ALREADY PASSED
●● 60 days.
Answer: Deadline to file a lien after a "notice of completion" is filed.
A.R.S. § 33-993(A)
●● 120 days.
Answer: Deadline to file a lien after "completion," if a notice of
completion is not filed. A.R.S. § 33-993(A
●● 6 months.
Answer: Deadline for enforcing a lien (by filing a lawsuit).
●● 10 days.
Answer: Deadline to dispute a lien after notice of owner's intent to retain
payment for the lien from payment to the contractor. A.R.S. § 33-994
●● 20 days.
, Answer: Deadline for releasing a lien that has been paid in full or
following written request, to avoid owing penalties and damages. A.R.S.
§ 33-1006
●● a contractor license is required when the total cost, including
materials is more than.
Answer: $1000
●● which state agency has the authority to issue a contractor license.
Answer: ROC
●● what is the role of the ROC.
Answer: ALL OF THE ABOVE
●● if you have a B- general license which of the items below must be
subcontracted ?.
Answer: all of the above
-repairing an hvac
-installing a pool
-wiring a homes electrical circuit