• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

Lare Practice Exam Questions With Verified Accurate Answers

Document preview thumbnail
Preview 3 out of 16 pages

LARE PRACTICE EXAM QUESTIONS WITH VERIFIED ACCURATE ANSWERS

Content preview

LARE PRACTICE EXAM QUESTIONS WITH VERIFIED
ACCURATE ANSWERS



What factors influence the scope of site inventory and analysis - Answers - - proposed
use for the site
- permitting requirements
- cost of data collection and analysis

What factors do not influence the scope of site inventory and analysis - Answers - -
proximity of site to transportation nodes

- microclimate

what document is most appropriate to control and otherwise manage growth in a city? -
Answers - zoning ordinance

contingency planning - Answers - a management technique that involves planning for
uncertainties or potential threats. it reduces the risks associated with these potential
problems

how does a comprehensive master plan differ from a zoning ordinance? - Answers - - a
comprehensive master plan offers guidance for future development

- zoning ordinance is a legally binding document used to regulate growth

how to effectively balance work across a project team? - Answers - by developing a
PWP with input from the project team

best place for a stormwater detention pond - Answers - the low point of a site

what is the most important things to consider when analyzing site circulation - Answers -
- interactions between various modes to transportation

- connections within the site's circulation system

- connections to circulation systems outside the site

- visibility of site entries and exits

what is considered the most important considerations when conducting an site analysis
- Answers - anything that involves the health, safety, and public welfare (circulation)

,hydrophobic soils - Answers - - exhibit water repellence and result in decreased
infiltration and increased runoff

- CAUSED BY WILDFIRES

how is a task defined - Answers - - an objective

- a timeline

- a level of effort

purchase of development rights (PDR) - Answers - encourage agricultural, open space,
or environmental uses on a site that might otherwise be developed

variables that influence the project development program - Answers - - size of project
site

- environmental features of a site

- proposed site requirements

5 benefits of focus groups - Answers - 1. can be used to gather public input and interest

2. the can produce both expert and casual opinions

3. they can bring together people with diverse viewpoints

4. they can be used to identify implementation obstacles

5. they can be recorded for later use

septic systems - Answers - - installed in rural and undeveloped areas where
connections to municipal infrastructure are not available

- not usually found in greyfield sites

what practice should a project manager do to ensure a deadline is met? - Answers - ask
members of the existing team to work overtime to meet the demanding deadline

DO BEARING EXERCISES FROM ANGLE AND DIRECTION - Answers -

what a project program should consist of - Answers - - goals and objectives

- elements to be included in the design

, - special requirements for the design to fulfil

geological factors that could negatively impact development of a site - Answers - -
shallow bedrock

- seismic fault

- soils with low bearing strength

what does sustainable design promote - Answers - - increasing pervious surface area

- on site stormwater management

- public safety

- increased property values

- IT DOES NOT REDUCE DEVELOPMEMT DENSITY

methods to employ while documenting a site's users, uses, and activities - Answers - -
interviews

- focus groups

- time lapse photography

- audio readings

what data should be collected during a site visit - Answers - - inventory of site existing
elements not found on a survey

- assessment of health and character of existing vegetation

- stakeholder interviews and surveys to site users

what management tools does a project manager utilize within the design firm - Answers
- - project planning

- scheduling

- quality control

- task management

- budgeting

Document information

Uploaded on
May 28, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2191
Followers
1449
Items
61657
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions