Jeopardy Review, Pop Quiz 1, UMO Phase One Study Guide UPDATED
ACTUAL QUESTIONS AND CORRECT ANSWERS
What are the three minimal level training requirements for recognize and identify HAZMAT shipments, understand hazard class numbering,
HAZMAT employees? and understand the 9 UN hazard classes and subdivisions
where would you block and brace your cargo within the cargo loaded inside of containers must be blocked and braced at the bottom,
container and how many inches from the door must the sides and in front of the cargo and the cargo should remain 6 inches away from
cargo be? the door
which steps are included when creating a Movement Plan 1. identify what must move
Deployment List? 2. identify how equipment will move
3. identify air movement requirements
4. identify HAZMAT, CI and SI
5. identify bulk cargo and develop packing lists
6. develop vehicle load plan
7. identify BBPCT requirements
8. translate what is to move into transportation terms
9. determine how PAX and cargo will move to POE
10. prepare unit movement plan
11. maintain unit movement plan
what are the four steps needed when calculating average 1. Use 55-46-1 to find lengths of all vehicles and trailers
vehicle length? 2. add all lengths together
3. divide by the number of prime movers
4. divide the average vehicle length (in inches) by 36. ALWAYS round up
, How many personnel, per railcar, are involved when 3--total personnel per railcar
loading equipment onto rail cars, excluding the OIC and 1--car guide (ground guide) and 2--side guides (one on each side of the railcar
NCOIC and what are names of those positions? during movement)
The ITO has what authority while complying with which The ITO is the approving authority which states loads are secured in complianse
association during rail loading operations and who is the with the American Association of Railroads (AAR) and the railway representative is
final approving authority for accepting rail loads? the final approving authority
Criteria to become a UMO *
Responsibilities of a UMO per 3-35, FM 4-0, FORSCOM Download*
55-1/55-2, ATP 4-11
Understanding the updating processes/responsibilities
regarding the OEL and UDL
Deployment Binder responsibilities and contents therein Recommended format (per ATP 3-35, Appendix D):
(unit movement SOP, recall rosters, OEL/UDL, orders, Unit movement SOP.
training certifications, POCs, packing lists, BBPCT Orders / training certificates for UMOs, load teams, and HAZMAT certifiers.
availability) Recall rosters and instructions.
Coordination requirements for plan execution and list of supporting agencies /
POCs.
Major equipment shortage list.
Supply list by SSA, coordination requirements, and requisitions.
List of BBPCT on hand and due out.
OEL/UDL.
Copies of packing lists.
Prepared copies of TMRs, etc.
Strip maps for convoy routes.
Advance party composition.
Sample forms.
Transportation requirements.
Rear detachment and family support group operations plans.
Unit-generated checklists or SOPs.
Off-duty hours contact telephone numbers.
Force projection process= mobilization (assembly of Flexible and rapid deployment of Army forces with sufficient depth and strength
organization), deployment (movement of forces) to sustain multiple, simultaneous operations
sustainment (personnel and logistics), redeployment Freedom of maneuver to position and sustain forces in in response to military
(return to home station) operations.
Requires extensive use of the international waters, international airspace, space,
cyberspace, and the electromagnetic spectrum.
Contingent not on the velocity of transportation means alone, but the combat-
readiness of the deployed force .
A military element of national power
The demonstrated ability to:
Alert
Mobilize
Deploy Rapidly
Operate effectively anywhere in the world
Rapid force deployment = Credible Power Projection
ACTUAL QUESTIONS AND CORRECT ANSWERS
What are the three minimal level training requirements for recognize and identify HAZMAT shipments, understand hazard class numbering,
HAZMAT employees? and understand the 9 UN hazard classes and subdivisions
where would you block and brace your cargo within the cargo loaded inside of containers must be blocked and braced at the bottom,
container and how many inches from the door must the sides and in front of the cargo and the cargo should remain 6 inches away from
cargo be? the door
which steps are included when creating a Movement Plan 1. identify what must move
Deployment List? 2. identify how equipment will move
3. identify air movement requirements
4. identify HAZMAT, CI and SI
5. identify bulk cargo and develop packing lists
6. develop vehicle load plan
7. identify BBPCT requirements
8. translate what is to move into transportation terms
9. determine how PAX and cargo will move to POE
10. prepare unit movement plan
11. maintain unit movement plan
what are the four steps needed when calculating average 1. Use 55-46-1 to find lengths of all vehicles and trailers
vehicle length? 2. add all lengths together
3. divide by the number of prime movers
4. divide the average vehicle length (in inches) by 36. ALWAYS round up
, How many personnel, per railcar, are involved when 3--total personnel per railcar
loading equipment onto rail cars, excluding the OIC and 1--car guide (ground guide) and 2--side guides (one on each side of the railcar
NCOIC and what are names of those positions? during movement)
The ITO has what authority while complying with which The ITO is the approving authority which states loads are secured in complianse
association during rail loading operations and who is the with the American Association of Railroads (AAR) and the railway representative is
final approving authority for accepting rail loads? the final approving authority
Criteria to become a UMO *
Responsibilities of a UMO per 3-35, FM 4-0, FORSCOM Download*
55-1/55-2, ATP 4-11
Understanding the updating processes/responsibilities
regarding the OEL and UDL
Deployment Binder responsibilities and contents therein Recommended format (per ATP 3-35, Appendix D):
(unit movement SOP, recall rosters, OEL/UDL, orders, Unit movement SOP.
training certifications, POCs, packing lists, BBPCT Orders / training certificates for UMOs, load teams, and HAZMAT certifiers.
availability) Recall rosters and instructions.
Coordination requirements for plan execution and list of supporting agencies /
POCs.
Major equipment shortage list.
Supply list by SSA, coordination requirements, and requisitions.
List of BBPCT on hand and due out.
OEL/UDL.
Copies of packing lists.
Prepared copies of TMRs, etc.
Strip maps for convoy routes.
Advance party composition.
Sample forms.
Transportation requirements.
Rear detachment and family support group operations plans.
Unit-generated checklists or SOPs.
Off-duty hours contact telephone numbers.
Force projection process= mobilization (assembly of Flexible and rapid deployment of Army forces with sufficient depth and strength
organization), deployment (movement of forces) to sustain multiple, simultaneous operations
sustainment (personnel and logistics), redeployment Freedom of maneuver to position and sustain forces in in response to military
(return to home station) operations.
Requires extensive use of the international waters, international airspace, space,
cyberspace, and the electromagnetic spectrum.
Contingent not on the velocity of transportation means alone, but the combat-
readiness of the deployed force .
A military element of national power
The demonstrated ability to:
Alert
Mobilize
Deploy Rapidly
Operate effectively anywhere in the world
Rapid force deployment = Credible Power Projection