Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 46 pages
Exam (elaborations)

EICA MOBILE CRANE & DIGGER DERRICK EXAM QUESTIONS AND ANSWERS | 100% VERIFIED AND WELL DETAILED ANSWERS | LATEST UPDATE 2026/2027 (GRADED A+)

Document preview thumbnail
Preview 4 out of 46 pages

EICA MOBILE CRANE & DIGGER DERRICK EXAM QUESTIONS AND ANSWERS | 100% VERIFIED AND WELL DETAILED ANSWERS | LATEST UPDATE 2026/2027 (GRADED A+)

Content preview

1|Page



EICA MOBILE CRANE & DIGGER DERRICK EXAM
QUESTIONS AND ANSWERS | 100% VERIFIED AND WELL
DETAILED ANSWERS | LATEST UPDATE 2026/2027
(GRADED A+)

If not overloaded, the ground bearing pressure of a single outrigger pad
can approach a weight equal to: ......ANSWER......85% of the weight of
the crane and 100% of the suspended load


If you move a crawler crane from soft ground to harder ground, ground
bearing pressure will ......ANSWER......increase


On a crawler crane, ground bearing pressure is greatest when hoisting
where? ......ANSWER......over the corner


If an outrigger pad has 45,000 pounds applied to it and the pad
measures 2ft x 2ft how many psi is it applying to the ground?
......ANSWER......78 PSI


How much area would be required for 45,000 pounds to create only 20
PSI? ......ANSWER......2,250 square inches


Why use mats or cribbing? ......ANSWER......To reduce ground bearing
pressure



pg. 1

,2|Page




What is the purpose of placing blocking or pads under the outrigger
floats? ......ANSWER......Distribute the force over a larger area


While swinging a heavy load with a crane set up on outriggers and the
operator swings over one of the outriggers, that outrigger must be able
to support ......ANSWER......85% of the weight of the crane and 100% of
the weight of the load


What is the first thing an operator should do before traveling under a
low pipe rack or obstruction? ......ANSWER......post a signalperson to
check clearances


According to OSHA, when traveling under an energized power line,
what is the minimum distance for a line with over 750kv?
......ANSWER......20ft


When a crane is in transit and you are required to pass under 50kV
power lines, what is OSHA's minimum required clearance?
......ANSWER......6 ft (Table T)


If setting up the crane by a ditch or an excavation, you should stay at
least what distance from the edge? ......ANSWER......1 ½ times the
depth of the excavation




pg. 2

,3|Page


When working at ground floor level near a cellar wall, the crane's
outrigger pads or tracks should be placed ......ANSWER......at least as far
back as the depth of the wall below ground


According to OSHA who is responsible for ensuring proper ground
conditions when setting up a mobile crane? ......ANSWER......The
controlling entity


What is not a good location for crane set up? ......ANSWER......Above
utilities


What is the best procedure to follow when underground utilities may
be present? ......ANSWER......Contact local utility company


While performing a shift inspection on a crane and there is water
accumulation around the outrigger, what must be done?
......ANSWER......Drained


While operating a boom truck near a reinforced retaining wall, it is
recommended to stay back ......ANSWER......A distance equal to the
depth


What would be a concern when setting up a crane over a sewer or
water main? ......ANSWER......Weight and vibration from the machine
and load



pg. 3

, 4|Page




When setting up a crane in an area that has public access, you should
barricade: ......ANSWER......the jobsite


When setting up a crane, what must be barricaded to protect workers?
......ANSWER......The hazardous areas created by the rotating
superstructure


According to OSHA, what area must be barricaded to prevent
employees from entering ......ANSWER......accessible areas within the
swing radius of the rear of the rotating superstructure of the crane


The best way to keep people from being injured from the
counterweight of the crane is to ......ANSWER......Fence or barricade the
swing area of the crane


When operating a crane in a tight space, what would be the
recommended minimum clearance for the rear swing of the crane?
......ANSWER......2 ft


The load line of the crane you're operating comes into contact with an
energized power line. There's no sign of any other danger, such as fire.
In such a situation, you should ......ANSWER......stay in the cab until the
lines are de-energized




pg. 4

Document information

Uploaded on
May 25, 2026
Number of pages
46
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.21

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AceExam1
3.5
(11)
Sold
40
Followers
1
Items
2605
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions