Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

CMGT ACTUAL EXAM PAPER 2026 QUESTIONS AND SOLUTIONS GRADED A+

Document preview thumbnail
Preview 4 out of 35 pages

CMGT ACTUAL EXAM PAPER 2026 QUESTIONS AND SOLUTIONS GRADED A+

Content preview

CMGT ACTUAL EXAM PAPER 2026
QUESTIONS AND SOLUTIONS GRADED A+


◉ Associated Schools of Construction (ASC)
Answer: 1965 nine universities met in Florida and formed this to
promote construction management as a legitimate and unique area
of study at universities.


◉ Steel
Answer: In the 1800's this was introduced to allow for high- rise
buildings.


◉ Objective of Project Management
Answer: May be said to be the achievement of predetermined
specifics within given targets of time, quality, cost and scope. But,
the measured of success of the project is the maintenance of
relationships and perceived satisfaction of all the stakeholders after
significant trade offs being made during the life cycle to maintain
scope, quality, time and budget.


◉ Heavy Civil
Answer: 10%

,Roadways, Bridges, Tunnels, Dams, Airports, and Railways
Mostly publicly funded.
Horizontal Construction


◉ Industrial
Answer: Steel mills, Processing plans, Manufacturing plants, Pipe
lines, Electrical generating facilities, Oil refineries, Chemical
processing plants.
Mostly publicly funded.
Least affected by economic fluctuations.
Quality and time most important.


◉ Funding Sources
Answer: 36% Public
64% Private


Public Building: 10%
Public Non-building: 12%
Private Building: 71%
Private Non-building: 7%


◉ Specialization

,Answer: Range of specialties helps insulate agains economic down
turns. Framing, Mechanical, Demolition, Roofing, Electrical, Public
works and Roads are major categories.


◉ Joint Venture/ Pooling Expertise
Answer: As projects grow in size and complexity and contracts
become schedule- oriented in order to mitigate costs, on- time
completion becomes essential, firms pool expertise and financial
resources for project bidding.


◉ Construction Management, Design- Build
Answer: The technological sophistication of many projects and
increased popularity of design-build contracts encourage the
integration of construction managers, architects, engineers and
construction companies.


◉ Repeat Business
Answer: Bypassing bidding altogether and going with established
relationships over low cost.


◉ Ethics
Answer: American Institute of Contractors Code of Ethics.
Bid Shopping.

, Being able to trust people we work with is a big part of putting our
best effort into our work.
Key success is creating a trusting environment in which people feel
comfortable with each other.


◉ Iron Triangle
Answer: These Construction Variables are Linked:
Schedule, Cost, and Quality


Change in one will affect the others:
Projects done faster require more financial resources and quality
may be compromised.
High technical performance... increased time and money to
complete.


◉ Architect
Answer: Lead Designer.
Creates Concept Drawings.
Staff include Drafters/ CAD Operators, Specification Writers, Interior
Designers, Landscape Architects.
Anxious to provide a good design service and build a reputation for
future work, perhaps creating a professional image in the final
building.

Document information

Uploaded on
May 25, 2026
Number of pages
35
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(25)
Sold
250
Followers
4
Items
63810
Last sold
11 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions