Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
22-05-2026
Written in
2025/2026

LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+ LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+ LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+ LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+ LEED reviewed Practice EXAM 100 questions and correct answers GRADED A+

Show more Read less
Institution
LEED Green Associate
Course
LEED Green Associate

Content preview

LEED REVIEWED
PRACTICE EXAM 100
QUESTIONS AND
CORRECT ANSWERS
GRADED A+ 2025-2026
a. Materials and Resources
b. Innovation
c. Sustainable Sites
d. Water Efficiency - ANS-1. Exemplary Performance credits can be achieved in which
LEED rating system category?


2. The term "stakeholder" encompasses more than just decision makers and includes: -
ANS-a. Those who must live with the decisions and those who must carry them out.
b. Everyone who has a financial stake in the building.
c. Everyone who is on the company payroll.
d. Those members of the community who are not affiliated with the company but are
affected by its
decisions.


a. Reverse Contribution to Global Climate Change
b. Protect, Enhance, and Restore Biodiversity and Ecosystem Services
c. Protect and Restore Water Resources

,d. Enhance Individual Human Health and Well-Being - ANS-3. What is the most critical
impact category out of the seven, meaning the largest environmental impact, as
determined by USGBC?


a. Building envelope

b. Project site boundary
c. Development footprint
d. Project to site ratio - ANS-4. The total land area of a project site covered by
buildings, streets, parking areas, and other typically

impermeable surfaces constructed as part of the project is called the:


a. Reduce heat island effect
b. Eliminate light pollution
c. Improve ground water quality
d. Protect open space
e. Reduce rainwater runoff - ANS-5. Pervious paving areas support which two
Sustainable Sites (SS) goals? (select two)


a. 0.25 gpf
b. 0.6 gpf
c. 1.6 gpf
d. 1.6 gpm - ANS-6. The Energy Policy Act of 1992 (EPAct 1992) establishes which flush
rate as the baseline water consumption for water closets?


A charrette is: - ANS-7. a. Generally held at the end of the project
b. The process of bringing in the design team only for focused conversations
c. The process brings together the project team with stakeholders and outside experts
for creative
thinking and collaboration
d. A gathering of LEED APs for a general discussion on sustainability


a. Systems are always simple and self-contained

, b. Most systems are actually systems within systems
c. Unchecked, positive feedback loops can create chaos in a system
d. Both the individual elements of the system and their relationships to each other as a
whole - ANS-8. When applying systems thinking to designing building and
communities, we must understand:


ASHRAE 55 relates to: - ANS-9. a. Minimum energy performance
b. Mechanically ventilated spaces
c. Thermal comfort of indoor occupants
d. Naturally ventilated spaces


a. Provide all employees with a free hybrid car after one year of employment.
b. Develop a sustainable materials policy outlining the goals, thresholds, and
procedures for procurement of ongoing consumables and durable goods.
c. Institute a green signage policy to put up signs reminding employees to turn off
lights and
computers, compost their food waste, and to recycle glass, aluminum, and paper.
d. Provide employees incentives such as vacation hours for purchasing products with
recycled
content and low VOCs.
e. Specify green custodial products that meet Green Seal, Environmental Choice or EPA
standards to protect indoor environmental quality. - ANS-10. Two strategies to
promote sustainable purchasing during design and operations are: (select two)


a. ASHRAE 90.1

b. HERS
c. Energy Star Portfolio Manager
d. Demand response - ANS-11. A program that allows utilities to call on buildings to
decrease their electricity use during peak times, reducing the strain on the grid and the
need to operate more power plants, thus potentially avoiding the costs of constructing
new plants is called:


a. Integrative water management

Written for

Institution
LEED Green Associate
Course
LEED Green Associate

Document information

Uploaded on
May 22, 2026
Number of pages
22
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Lectmaureen

Get to know the seller

Seller avatar
Lectmaureen Cambridge College
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 year
Number of followers
0
Documents
457
Last sold
-
LECTMAUREEN STUDY HUB

On this page, you find all documents, package deals, and flashcards offered by seller Lectmaureen

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions