● One of the most important elements of the pre-job planning is:
Answer: The location of utility services.
● Proper equipment for prompt transportation of an injured worker, as
well as a communication system to contact any necessary ambulance
service, must be available: Answer: On the work site.
● Mechanical demolition refers to demolition using equipment like:
Answer: Wrecking balls or jackhammers.
● Prestressed concrete is: Answer: A structural material with tensioned
steel strands embedded inside, which compress the concrete and give it
extra strength.
● Simple pretensioned beams and slabs of spans up to about 7 meters
(23 feet) Answer: Can be demolished in a manner similar t ordinary
reinforced concrete.
● Electrical detonators can be inadvertently triggered by stray RF
signals from two way radios.
QUESTIONS AND ANSWERS 2026 EXPERT
VERIFIED STUDY MATERIAL
● One of the most important elements of the pre-job planning is:
Answer: The location of utility services.
● Proper equipment for prompt transportation of an injured worker, as
well as a communication system to contact any necessary ambulance
service, must be available: Answer: On the work site.
● Mechanical demolition refers to demolition using equipment like:
Answer: Wrecking balls or jackhammers.
● Prestressed concrete is: Answer: A structural material with tensioned
steel strands embedded inside, which compress the concrete and give it
extra strength.
● Simple pretensioned beams and slabs of spans up to about 7 meters
(23 feet) Answer: Can be demolished in a manner similar t ordinary
reinforced concrete.
● Electrical detonators can be inadvertently triggered by stray RF
signals from two way radios.