Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

CEPSCI (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) 2026 UPDATED ACTUAL EXAM WITH CORRECT SOLUTIONS.

Document preview thumbnail
Preview 3 out of 18 pages

CEPSCI (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) 2026 UPDATED ACTUAL EXAM WITH CORRECT SOLUTIONS.

Content preview

1 | Page

CEPSCI (CERTIFIED EROSION PREVENTION
AND SEDIMENT CONTROL INSPECTOR) 2026
UPDATED ACTUAL EXAM WITH CORRECT
SOLUTIONS.



NPDES - correct answer- National Pollutant Discharge
Elimination System




Clean Water Act - correct answer- Administered by the EPA in
1972




Water Quality Act - correct answer- Amendment to CWA in
1987 to regulate storm water discharges under NPDES
program




Point Source Pollution - correct answer- Discharges from
readily identifiable sources like treatment plants




Nonpoint Source Solution - correct answer- Runoff from
urbanized or agricultural areas

,2 | Page

NPDES in South Carolina - correct answer- SC is a delegated
state. Regulations are administered by SCDHEC




CGP Phase II - correct answer- Construction General Permit
effective on September 1, 2006




NPDES Permit Coverage - correct answer- 1 or more acres of
land disturbance. Within 1/2 mile of a receiving water body in
SC Coastal Zone




NOI - correct answer- Notice Of Intent




CGP Requirements for OCRM - correct answer- Coverage
granted 7 days after DHEC receives NOI




CGP Requirements for SCDOT - correct answer- Coverage
granted 10 days after DHEC receives NOI




CGP Requirements for DHEC - correct answer- Coverage
granted 20 days after DHEC receives completed NOI

, 3 | Page



SWPPP - correct answer- Storm Water Pollution Prevention
Plan, Completed prior to filing NOI, Prepared in accordance
with Phase II CGP




SWPPP Requirements - correct answer- Identification of
operators
Sequence of construction
Locations of all BMP's
Locations of all surface waters of state




CGP Filing - correct answer- Must be in compliance with all
other permits
Must comply with Federal reporting requirements
File NOT when construction is complete
Retain documentation 3 years.




Pre Construction meeting - correct answer- 10 or more acres
Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must
be present

Document information

Uploaded on
May 18, 2026
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EliteStudyHub
2.1
(10)
Sold
85
Followers
6
Items
9362
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions