ICC MASONRY CERTIFICATION SCRIPT
2026 QUESTIONS WITH SOLUTIONS
GRADED A+

◍ Which of the following is the standard specification for loadbearing
concrete masonry units?.
Answer: ASTM C 90; RCMCI 6th Edition, Section 2.2.1
◍ Which of the following grout admixtures is used to obtain a high slump with
reduced water?.
Answer: Super plasticizer; RCMCI 6th Edition, Section 2.11.6
◍ on a piece of rebar, the top mark is an "A" what does the reference indicate?.
Answer: The producing mill or manufacturer.
◍ Which of the following is the standard specification that autoclaved aerated
concrete masonry units must conform to for the strength class specified in
the contract documents?.
Answer: ASTM C 1386; CI 530; Part 2, Section 2.3E. IBC 2103.3
◍ for a NON-PARTICIPATING element in a SDC D, vertical bars must be
placed within ______ OF THE ENDS OF THE MASONRY WALL
S. .
Answer: 16 INCHES
◍ Grout intended for use in the construction of engineered and empirically
designed masonry structures must comply with.
Answer: ASTM C 476; 2006 IBC 2103.12
◍ The slump test for grout must be performed in accordance with.
Answer: ASTM C 1019; ASTM - C1019-03
◍ In what condition are grout specimens to be tested?.

, Answer: Damp; ASTM - 1019-03
◍ THE Bar extension length for a #6 180-degree hook is ___ for 40 bar and
___for grade 60 bar IN INCHE
S. .
Answer: 3,3
◍ When the prism test method is being utilized, how long must the prisms cure
prior to being cut?.
Answer: 28; 2006 IBC 2105.3.1
◍ what is the "minimum" diameter of bend for a #5 Grade 60 bar with a
180-degree hook?.
Answer: 3"-3/4 inches
◍ After construction and grouting, masonry test prisms should not be disturbed
or moved for a minimum of.
Answer: 48 hours; ASTM - C 1314, Section 5.10
◍ When field sampling grout, the elapsed time between obtaining the first and
final portions of the sample shall not be more than.
Answer: 15 minutes; ASTM - C1019, Section 7.2.1
◍ If mortar compression tests are required, how many tests per day are to be
taken for the three successive work days at the start of the job?.
Answer: 1; RCMCI 6th Edition, 3.2.4
◍ Glass unit masonry shall not be laid at temperatures below.
Answer: 60 degrees F; 2006 IBC 2104.3.2.1
◍ What is the maximum mean daily temperature permitted before newly
constructed masonry must be fog sprayed during curing?.
Answer: 100 degrees F; 2006 IBC 2104.4.3
◍ When the temperature is below 40 degrees F, newly constructed masonry
must be covered with a weather resistant membrane for a minimum of.
Answer: 24 hours; 2006 IBC 2104.3.3.3
◍ After initial mixing, when the ambient temperature exceeds 90 degrees F

, with a wind velocity over 8 mph, mortar used in masonry construction must
be discarded after.
Answer: 2 hours; 2006 IBC 2104.4.2.1
◍ when does windbreak need to be used ?.
Answer: When construction temperatures fall below 25F DEGREES and
wind is more than 15 MPH.
◍ WHEN PRODUCTING ASTM C476 Grout , aggregates used must conform
with ?.
Answer: ASTM C404
◍ Which type of unit masonry is required to be placed with head and bed
joints solidly filled?.
Answer: Glass; 2006 IBC 2104.1.2.4
◍ Thin bed mortar joints used in laying autoclaved aerated concrete masonry
units shall not exceed a thickness of.
Answer: 1/16"; 2006 IBC 2104.1.2.6
◍ when can aluminum pipes or conduits be embedded in mortar or grout?.
Answer: when Effectively coated or isolated to prevent chemical reaction
between aluminum and cement.
◍ When the ambient temperature exceeds 100 degrees F or exceeds 90 degrees
F with a wind velocity over 8 mph, what is the maximum distance that
mortar may be spread ahead of AAC masonry units?.
Answer: 4'; RCMCI 6th Edition, Section 11.2.4, 2006 IBC 2104.4.2.1(5).
◍ one way to check CMU block moisture in the field is?.
Answer: break it open and look for internal moisture.
◍ What is the maximum spacing for weep holes placed in the outside wythe of
masonry walls?.
Answer: 33" on center; 2006 IBC 2104.1.8
◍ what is the maximum Grout '"POUR HEIGHT" for fine grout and coarse
grout, ?.

Document information

Uploaded on
May 17, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
3.9
(24)
Sold
231
Followers
3
Items
60526
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions