EXAM
Exam Solution+t
VA CBC Exam Questions & Answers 100% Verified solut
+t +t +t +t +t +t +t +t
ions () UPDATE !! EXAM 2026 A+ GRADE ASSURED COM
+t +t +t +t +t +t +t +t +t
PLETE SOLUTIONS AND VERIFIED ANSWERS (98439)
+t +t +t +t +t
QUESTION 1 +t
Term
ANSWER
Definition
QUESTION 2 +t
What should a leading-edge worker do when aligning the side lap?
+t +t +t +t +t +t +t +t +t +t
a. He should tighten his fail protection
+t +t +t +t +t +t
b. He should tack weld the side laps
+t +t +t +t +t +t +t
c. He should kneel
+t +t +t
d. He should use set screws
+t +t +t +t +t
ANSWER
c. He should kneel
+t +t +t
QUESTION 3 +t
For polyurethane used as a moisture barrier beneath a concrete slab, the joists shall be l
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
apped a MINIMUM of +t +t +t
a. 6 inches
+t +t
b. 5 inches
+t +t
c. 4 inches
+t +t
d. 2 inches
+t +t
ANSWER
a. 6 inches
+t +t
,QUESTION 4 +t
What effect will be adding water to concrete have on the slump?
+t +t +t +t +t +t +t +t +t +t +t
a. It will increase the slump
+t +t +t +t +t
b. It will decrease the slump
+t +t +t +t +t
c. It will have no effect on the slump
+t +t +t +t +t +t +t +t
d. It depends on the temperature
+t +t +t +t +t
ANSWER
a. It will increase the slump
+t +t +t +t +t
QUESTION 5 +t
Valley flashing for slate roofs shall be a MINIMUM of
+t +t +t +t +t +t +t +t +t
a. 26-gage galvanized steel 24 inches wide
+t +t +t +t +t +t
b. 20-gage galvanized steel 20 inches wide
+t +t +t +t +t +t
c. .0800 inch aluminum 15-inches wide
+t +t +t +t +t
d. .01719 inch zinc coated G90 15-inches wide
+t +t +t +t +t +t +t
ANSWER
d. .01719 inch zinc coated G90 15-inches wide
+t +t +t +t +t +t +t
QUESTION 6 +t
When figuring nominal dimensions on new construction, what is the intended size of the
+t +t +t +t +t +t +t +t +t +t +t +t +t
mortar joint for concrete masonry unit
+t +t +t +t +t +t
a. 1/4 inch
+t +t
b. 3/8 inch
+t +t
c. 1/2 inch
+t +t
d. 5/8 inch
+t +t
ANSWER
b. 3/8 inch
+t +t
QUESTION 7 +t
Which stud would most likely be used to frame bearing exterior wall?
+t +t +t +t +t +t +t +t +t +t +t
a. 25-gauge C studs
+t +t +t
b. 20-gauge corrugated studs
+t +t +t
c. Studs with stiffened flanges
+t +t +t +t
d. 22-gauge perforated web stubs
+t +t +t +t
ANSWER
c. Studs with stiffened flanges
+t +t +t +t
,QUESTION 8 +t
The contour lines on a drawing show elevation of 120 feet and 130 feet. The contour lin
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
es are 50 feet apart. What is the grade of the ground between these two counter lines?
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
a. 10%
+t
b. 15%
+t
c. 20%
+t
d. 25%
+t
ANSWER
c. 20%
+t
QUESTION 9 +t
What can be done to increase the abrasion of concrete?
+t +t +t +t +t +t +t +t +t
a. Use a harder aggregate
+t +t +t +t
b. Increase permeability
+t +t
ANSWER
a. Use a harder aggregate
+t +t +t +t
QUESTION 10 +t
The MAXIMUM moisture content for pressure treated wood to be used where air drying
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
in use CANNOT occur should be
+t +t +t +t +t
a. Not greater than 19%
+t +t +t +t
b. Less than or equal to 11%
+t +t +t +t +t +t
c. At least 10%
+t +t +t
d. Between 9% and 22%
+t +t +t +t
ANSWER
a. Not greater than 19%
+t +t +t +t
QUESTION 11 +t
If a foundation drain is required, then the top of the drain shall not be less than how ma
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
ny inches above the top of the footing?
+t +t +t +t +t +t +t
a. 2
+t
b. 4
+t
c. 6
+t
d. 8
+t
ANSWER
, c. 6
+t
QUESTION 12 +t
How many 8 x 8 x 16 concrete masonry units will be REQUIRED for one course of 224-
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
foot long wall?
+t +t
a. Less than 150
+t +t +t
b. Between 150 and 200
+t +t +t +t
c. Between 201 and 250
+t +t +t +t
d. More than 250
+t +t +t
ANSWER
b. Between 150 and 200
+t +t +t +t
QUESTION 13 +t
An efficient method of lowering the water table in an excavation on a level lot is to
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
a. Install trench boxes
+t +t +t
b. Dig channels outside the excavation
+t +t +t +t +t
c. Dig ditches inside the excavation
+t +t +t +t +t
d. Install a wellpoint system
+t +t +t +t
ANSWER
d. Install a wellpoint system
+t +t +t +t
QUESTION 14 +t
What is the MINIMUM clearance on the pull side of an accessible manual swinging door
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
when approaching from the front parallel of the doorway
+t +t +t +t +t +t +t +t
a. 12 inches
+t +t
b. 18 inches
+t +t
c. 20 inches
+t +t
d. 24 inches
+t +t
ANSWER
b. 18 inches
+t +t
QUESTION 15 +t
How should the metal deck erector install the endlaps of a roof deck?
+t +t +t +t +t +t +t +t +t +t +t +t
a. The endlap should have a minimum of 1/2 inch overlap.
+t +t +t +t +t +t +t +t +t +t
b. The endlap should be tack welded.
+t +t +t +t +t +t
c. The center of the endlap portion should occur over the support.
+t +t +t +t +t +t +t +t +t +t +t
d. They should be arranged so that the ends of the lap are staggered over the supports.
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
Exam Solution+t
VA CBC Exam Questions & Answers 100% Verified solut
+t +t +t +t +t +t +t +t
ions () UPDATE !! EXAM 2026 A+ GRADE ASSURED COM
+t +t +t +t +t +t +t +t +t
PLETE SOLUTIONS AND VERIFIED ANSWERS (98439)
+t +t +t +t +t
QUESTION 1 +t
Term
ANSWER
Definition
QUESTION 2 +t
What should a leading-edge worker do when aligning the side lap?
+t +t +t +t +t +t +t +t +t +t
a. He should tighten his fail protection
+t +t +t +t +t +t
b. He should tack weld the side laps
+t +t +t +t +t +t +t
c. He should kneel
+t +t +t
d. He should use set screws
+t +t +t +t +t
ANSWER
c. He should kneel
+t +t +t
QUESTION 3 +t
For polyurethane used as a moisture barrier beneath a concrete slab, the joists shall be l
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
apped a MINIMUM of +t +t +t
a. 6 inches
+t +t
b. 5 inches
+t +t
c. 4 inches
+t +t
d. 2 inches
+t +t
ANSWER
a. 6 inches
+t +t
,QUESTION 4 +t
What effect will be adding water to concrete have on the slump?
+t +t +t +t +t +t +t +t +t +t +t
a. It will increase the slump
+t +t +t +t +t
b. It will decrease the slump
+t +t +t +t +t
c. It will have no effect on the slump
+t +t +t +t +t +t +t +t
d. It depends on the temperature
+t +t +t +t +t
ANSWER
a. It will increase the slump
+t +t +t +t +t
QUESTION 5 +t
Valley flashing for slate roofs shall be a MINIMUM of
+t +t +t +t +t +t +t +t +t
a. 26-gage galvanized steel 24 inches wide
+t +t +t +t +t +t
b. 20-gage galvanized steel 20 inches wide
+t +t +t +t +t +t
c. .0800 inch aluminum 15-inches wide
+t +t +t +t +t
d. .01719 inch zinc coated G90 15-inches wide
+t +t +t +t +t +t +t
ANSWER
d. .01719 inch zinc coated G90 15-inches wide
+t +t +t +t +t +t +t
QUESTION 6 +t
When figuring nominal dimensions on new construction, what is the intended size of the
+t +t +t +t +t +t +t +t +t +t +t +t +t
mortar joint for concrete masonry unit
+t +t +t +t +t +t
a. 1/4 inch
+t +t
b. 3/8 inch
+t +t
c. 1/2 inch
+t +t
d. 5/8 inch
+t +t
ANSWER
b. 3/8 inch
+t +t
QUESTION 7 +t
Which stud would most likely be used to frame bearing exterior wall?
+t +t +t +t +t +t +t +t +t +t +t
a. 25-gauge C studs
+t +t +t
b. 20-gauge corrugated studs
+t +t +t
c. Studs with stiffened flanges
+t +t +t +t
d. 22-gauge perforated web stubs
+t +t +t +t
ANSWER
c. Studs with stiffened flanges
+t +t +t +t
,QUESTION 8 +t
The contour lines on a drawing show elevation of 120 feet and 130 feet. The contour lin
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
es are 50 feet apart. What is the grade of the ground between these two counter lines?
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
a. 10%
+t
b. 15%
+t
c. 20%
+t
d. 25%
+t
ANSWER
c. 20%
+t
QUESTION 9 +t
What can be done to increase the abrasion of concrete?
+t +t +t +t +t +t +t +t +t
a. Use a harder aggregate
+t +t +t +t
b. Increase permeability
+t +t
ANSWER
a. Use a harder aggregate
+t +t +t +t
QUESTION 10 +t
The MAXIMUM moisture content for pressure treated wood to be used where air drying
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
in use CANNOT occur should be
+t +t +t +t +t
a. Not greater than 19%
+t +t +t +t
b. Less than or equal to 11%
+t +t +t +t +t +t
c. At least 10%
+t +t +t
d. Between 9% and 22%
+t +t +t +t
ANSWER
a. Not greater than 19%
+t +t +t +t
QUESTION 11 +t
If a foundation drain is required, then the top of the drain shall not be less than how ma
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
ny inches above the top of the footing?
+t +t +t +t +t +t +t
a. 2
+t
b. 4
+t
c. 6
+t
d. 8
+t
ANSWER
, c. 6
+t
QUESTION 12 +t
How many 8 x 8 x 16 concrete masonry units will be REQUIRED for one course of 224-
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
foot long wall?
+t +t
a. Less than 150
+t +t +t
b. Between 150 and 200
+t +t +t +t
c. Between 201 and 250
+t +t +t +t
d. More than 250
+t +t +t
ANSWER
b. Between 150 and 200
+t +t +t +t
QUESTION 13 +t
An efficient method of lowering the water table in an excavation on a level lot is to
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
a. Install trench boxes
+t +t +t
b. Dig channels outside the excavation
+t +t +t +t +t
c. Dig ditches inside the excavation
+t +t +t +t +t
d. Install a wellpoint system
+t +t +t +t
ANSWER
d. Install a wellpoint system
+t +t +t +t
QUESTION 14 +t
What is the MINIMUM clearance on the pull side of an accessible manual swinging door
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
when approaching from the front parallel of the doorway
+t +t +t +t +t +t +t +t
a. 12 inches
+t +t
b. 18 inches
+t +t
c. 20 inches
+t +t
d. 24 inches
+t +t
ANSWER
b. 18 inches
+t +t
QUESTION 15 +t
How should the metal deck erector install the endlaps of a roof deck?
+t +t +t +t +t +t +t +t +t +t +t +t
a. The endlap should have a minimum of 1/2 inch overlap.
+t +t +t +t +t +t +t +t +t +t
b. The endlap should be tack welded.
+t +t +t +t +t +t
c. The center of the endlap portion should occur over the support.
+t +t +t +t +t +t +t +t +t +t +t
d. They should be arranged so that the ends of the lap are staggered over the supports.
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t