QUESTION 1 +t
Factor that will influence both government and construction industry in the future
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
New government regulations, greater influence from consumer, improvement in QC and QA requiremen
+t +t +t +t +t +t +t +t +t +t +t +t
ts, construction-
+t
oriented management info systems, formal partnering involving stakeholders, more reliance on design-
+t +t +t +t +t +t +t +t +t +t +t
build, more considerate for live cycle requirements and increased based incentives
+t +t +t +t +t +t +t +t +t +t
QUESTION 2 +t
Actual construction on the jobsite begins:
+t +t +t +t +t
ANSWER
After an interim or final QC is accepted
+t +t +t +t +t +t +t
QUESTION 3 +t
Control is +t
ANSWER
A continual system of planned future activities (its preventative)
+t +t +t +t +t +t +t +t
QUESTION 4 +t
Design-Build contracts require +t +t
ANSWER
The QC Manager to be in place and take an active role in the review and coordination of the design.
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
, QUESTION 5 +t
ENG Form 4288-R, the submittal register
+t +t +t +t +t
ANSWER
identifies this submittals requiring government approval
+t +t +t +t +t
QUESTION 6 +t
Ground for withholding payment include the contractor's failure to
+t +t +t +t +t +t +t +t
ANSWER
Perform in accordance with the terms of the contract, provide an acceptable Quality Control Plan giving
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +
assurance of intent and ability to comply with quality standards, and build to the quality standards esta
t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
blished by the contract
+t +t +t
QUESTION 7 +t
In a design build contract, if the contractor has a question about the design, what is the
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
process to get an answer? +t +t +t +t
ANSWER
Contractor submits a Design Verification Clarification Request (DVCR) to the contractor's design team
+t +t +t +t +t +t +t +t +t +t +t +t
QUESTION 8 +t
Partnering relationships are based upon +t +t +t +t
ANSWER
Building trust and dedication to common goals
+t +t +t +t +t +t
QUESTION 9 +t
Requests for information are submitted to
+t +t +t +t +t
ANSWER
Ask for clarification of the contract
+t +t +t +t +t
QUESTION 10 +t
Submittals are +t
ANSWER
necessary to demonstrate that the proposed materials, etc are in compliance with the contract
+t +t +t +t +t +t +t +t +t +t +t +t +t
Exam Solution +t
CQM Course Questions 2026 A+ GRADE ASSURED COMP
+t +t +t +t +t +t +t
LETE SOLUTIONS AND VERIFIED ANSWERS (3CA67)
+t +t +t +t +t
QUESTION 1 +t
Factor that will influence both government and construction industry in the future
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
New government regulations, greater influence from consumer, improvement in QC and QA requiremen
+t +t +t +t +t +t +t +t +t +t +t +t
ts, construction-
+t
oriented management info systems, formal partnering involving stakeholders, more reliance on design-
+t +t +t +t +t +t +t +t +t +t +t
build, more considerate for live cycle requirements and increased based incentives
+t +t +t +t +t +t +t +t +t +t
QUESTION 2 +t
Actual construction on the jobsite begins:
+t +t +t +t +t
ANSWER
After an interim or final QC is accepted
+t +t +t +t +t +t +t
QUESTION 3 +t
Control is +t
ANSWER
A continual system of planned future activities (its preventative)
+t +t +t +t +t +t +t +t
QUESTION 4 +t
Design-Build contracts require +t +t
ANSWER
The QC Manager to be in place and take an active role in the review and coordination of the design.
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
, QUESTION 5 +t
ENG Form 4288-R, the submittal register
+t +t +t +t +t
ANSWER
identifies this submittals requiring government approval
+t +t +t +t +t
QUESTION 6 +t
Ground for withholding payment include the contractor's failure to
+t +t +t +t +t +t +t +t
ANSWER
Perform in accordance with the terms of the contract, provide an acceptable Quality Control Plan giving
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +
assurance of intent and ability to comply with quality standards, and build to the quality standards esta
t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
blished by the contract
+t +t +t
QUESTION 7 +t
In a design build contract, if the contractor has a question about the design, what is the
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
process to get an answer? +t +t +t +t
ANSWER
Contractor submits a Design Verification Clarification Request (DVCR) to the contractor's design team
+t +t +t +t +t +t +t +t +t +t +t +t
QUESTION 8 +t
Partnering relationships are based upon +t +t +t +t
ANSWER
Building trust and dedication to common goals
+t +t +t +t +t +t
QUESTION 9 +t
Requests for information are submitted to
+t +t +t +t +t
ANSWER
Ask for clarification of the contract
+t +t +t +t +t
QUESTION 10 +t
Submittals are +t
ANSWER
necessary to demonstrate that the proposed materials, etc are in compliance with the contract
+t +t +t +t +t +t +t +t +t +t +t +t +t