QUESTION 1 +t
Wood wall framing supporting gypsum board and gypsum panel product shall not be les
+t +t +t +t +t +t +t +t +t +t +t +t +t
s than __________ nominal thickness in the least dimension.
+t +t +t +t +t +t +t +t
ANSWER
2-inch
QUESTION 2 +t
The fire-resistant rated wall or assembly separating townhomes shall be......
+t +t +t +t +t +t +t +t +t
ANSWER
continuous from foundation to the underside of roof shading
+t +t +t +t +t +t +t +t
QUESTION 3 +t
What is the maximum span for a 2 x 8Douglas fir-
+t +t +t +t +t +t +t +t +t +t
larch #2 ceiling joists with an attic without storage and joist spacing of 16 inches?
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
ANSWER
23 feet 4 inches
+t +t +t
QUESTION 4 +t
Wall and ceiling finishes shall have a flame spread index not exceeding
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
200
, QUESTION 5 +t
Habitable room shall not be less than _____________ in any horizontal dimension.
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
7 feet
+t
QUESTION 6 +t
A track splice for cold form steel framed walls shall have
+t +t +t +t +t +t +t +t +t +t
ANSWER
four #8 screws on each side of the splice
+t +t +t +t +t +t +t +t
QUESTION 7 +t
How many coats of portland cement exterior plaster are required at a minimum when a
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
pplied over masonry or concrete?
+t +t +t +t
ANSWER
2 coats
+t
QUESTION 8 +t
the greatest tread depth within any flight of stairs shall not exceed the smallest by more
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
than
ANSWER
3/8 - inch +t +t
QUESTION 9 +t
Cold-
formed steel ceiling joist shall have a bearing support length of not less than _________ and
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
shall be connected to rafters.
+t +t +t +t +t
ANSWER
1 1/2 inches
+t +t
QUESTION 10 +t
Fasteners used to install vinyl siding shall penetrate sheathing, furring framing or other
+t +t +t +t +t +t +t +t +t +t +t +t +t
nailable substrate a minimum of +t +t +t +t
Exam Solution
+t
ICC certification J1 final 2026 A+ GRADE ASSURED COM
+t +t +t +t +t +t +t +t
PLETE SOLUTIONS AND VERIFIED ANSWERS (505E9) +t +t +t +t +t
QUESTION 1 +t
Wood wall framing supporting gypsum board and gypsum panel product shall not be les
+t +t +t +t +t +t +t +t +t +t +t +t +t
s than __________ nominal thickness in the least dimension.
+t +t +t +t +t +t +t +t
ANSWER
2-inch
QUESTION 2 +t
The fire-resistant rated wall or assembly separating townhomes shall be......
+t +t +t +t +t +t +t +t +t
ANSWER
continuous from foundation to the underside of roof shading
+t +t +t +t +t +t +t +t
QUESTION 3 +t
What is the maximum span for a 2 x 8Douglas fir-
+t +t +t +t +t +t +t +t +t +t
larch #2 ceiling joists with an attic without storage and joist spacing of 16 inches?
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
ANSWER
23 feet 4 inches
+t +t +t
QUESTION 4 +t
Wall and ceiling finishes shall have a flame spread index not exceeding
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
200
, QUESTION 5 +t
Habitable room shall not be less than _____________ in any horizontal dimension.
+t +t +t +t +t +t +t +t +t +t +t
ANSWER
7 feet
+t
QUESTION 6 +t
A track splice for cold form steel framed walls shall have
+t +t +t +t +t +t +t +t +t +t
ANSWER
four #8 screws on each side of the splice
+t +t +t +t +t +t +t +t
QUESTION 7 +t
How many coats of portland cement exterior plaster are required at a minimum when a
+t +t +t +t +t +t +t +t +t +t +t +t +t +t
pplied over masonry or concrete?
+t +t +t +t
ANSWER
2 coats
+t
QUESTION 8 +t
the greatest tread depth within any flight of stairs shall not exceed the smallest by more
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
than
ANSWER
3/8 - inch +t +t
QUESTION 9 +t
Cold-
formed steel ceiling joist shall have a bearing support length of not less than _________ and
+t +t +t +t +t +t +t +t +t +t +t +t +t +t +t
shall be connected to rafters.
+t +t +t +t +t
ANSWER
1 1/2 inches
+t +t
QUESTION 10 +t
Fasteners used to install vinyl siding shall penetrate sheathing, furring framing or other
+t +t +t +t +t +t +t +t +t +t +t +t +t
nailable substrate a minimum of +t +t +t +t