Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

API 653 Tank Inspection, API 650 Construction Requirements, Annex M Elevated Temperature Operation, Annex U Ultrasonic Substitution for RT, Annex G Magnetic Flux Leakage Guidance, Section 8 NDE Requirements, Section 12 Repair & Alteration Rules, NDE Techn

Document preview thumbnail
Preview 3 out of 17 pages

API 653 Tank Inspection, API 650 Construction Requirements, Annex M Elevated Temperature Operation, Annex U Ultrasonic Substitution for RT, Annex G Magnetic Flux Leakage Guidance, Section 8 NDE Requirements, Section 12 Repair & Alteration Rules, NDE Techniques (RT, UT, MT, PT), Fitness-for-Service (API 579), Risk-Based Inspection (RBI), Hydrostatic Testing Procedures, Shell-to-Bottom Weld Evaluation, Shell Plate Integrity & Lamination Checks, Bottom Plate Corrosion Assessment, Annular Plate Replacement Criteria, Critical Zone Repair Requirements, Vacuum Box Testing Methods, Air Leak Testing Procedures, Settlement Survey Calculations & Monitoring, Cathodic Protection Systems, Thin-Film Lining Applications, Release Prevention Barrier Systems, Welding Procedure Specification (WPS) Compliance, Procedure Qualification Records (WPQ), ASNT SNT-TC-1A Level II Certification, Weld Repair Acceptance Criteria, Nozzle Reinforcement & Stress Calculations, Stress Corrosion Cracking Mitigation, Post-Weld Heat Treatment Considerations, Radiographic Testing Acceptance Standards, Visual Inspection Requirements Exam Questions Verified and Provided with Complete A+ Graded Answers Latest Updated 2026 All NDE shall be performed in accordance to what standard? API 650, Section 8 and any supplemental requirements of API 653, section 12 Personnel performing NDE shall be qualified in accordance with what standard? API 650, Section 8 and any supplemental requirements of API 653, Section 12 Acceptance criteria for NDE shall be in accordance with what standard? API 650, Section 8 and any supplemental requirements of API 653, Section 12 Examiners performing NDE shall be Certified how? Shall be a Level II according to ASNT-SNT-TC-1A What examinations shall be performed on newly deposited weld metal or any cavity resulted by grinding or gouging operations? Shall be visually examined over its entire length, Additional NDE of those welds may be required as described in relevant sections of API 653, Section 12.1 Annex G may be used to provide what additional guidance? Annex G may be used to provide additional guidance in qualifying personnel and procedures when magnetic flux leakage tools are used to examine tank bottoms. Owner/operators should determine specific requirements to meet their tank bottom needs. When may UT examination in accordance with API 650, Annex U, be used when RT is specified for examination of welds? May be used for RT with agreement between purchaser and manufacturer When and where shall UT examination of shell plate for lamination be performed? UT examination of shell plate shall be made in the immediate affected area when adding a reinforcement plate to an existing unreinforced shell penetration and when adding a hot tap. How shall cavities resulting from gouging or grinding operations to remove attachment welds of existing reinforcement plates? Shall be examined by MT or PT Complted welds attaching nozzle neck to shell, and reinforcement plate to shell and to nozzle neck, shall require what NDE? Shall be examined by MT or PT. Consider additional examination (e.g. WFMT and/or UT) for hat tap connection onto shell plates of unknown toughness. Completed welds of stress-relieved assemblies on shell penetrations shall require what NDE? Shall be examined by MT or PT after stress relief, but before hydro. Cavities resulting from grinding or gouging operations to remove weld defects shall require what NDE? Shall be examined using MT or PT Completed weld repairs of butt welds shall be examined volumetrically how? Shall be examined over the full length by RT or UT. However, for completed repairs to butt welds found in shell plate to shell plate joints, the additional RT's, as required in 12.2.1.1.C, 12.2.1.2.C, and 12.2.1.3.C, do not apply. How shall weld repairs of fillet weld be examined? Shall be examined over their full length by the appropriate NDE method listed in herein.

Content preview

API 653 Tank Inspection, API 650 Construction Requirements, Annex M
Elevated Temperature Operation, Annex U Ultrasonic Substitution for RT,
Annex G Magnetic Flux Leakage Guidance, Section 8 NDE Requirements,
Section 12 Repair & Alteration Rules, NDE Techniques (RT, UT, MT, PT),
Fitness-for-Service (API 579), Risk-Based Inspection (RBI), Hydrostatic
Testing Procedures, Shell-to-Bottom Weld Evaluation, Shell Plate Integrity
& Lamination Checks, Bottom Plate Corrosion Assessment, Annular Plate
Replacement Criteria, Critical Zone Repair Requirements, Vacuum Box
Testing Methods, Air Leak Testing Procedures, Settlement Survey
Calculations & Monitoring, Cathodic Protection Systems, Thin-Film Lining
Applications, Release Prevention Barrier Systems, Welding Procedure
Specification (WPS) Compliance, Procedure Qualification Records (WPQ),
ASNT SNT-TC-1A Level II Certification, Weld Repair Acceptance Criteria,
Nozzle Reinforcement & Stress Calculations, Stress Corrosion Cracking
Mitigation, Post-Weld Heat Treatment Considerations, Radiographic
Testing Acceptance Standards, Visual Inspection Requirements Exam
Questions Verified and Provided with Complete A+ Graded Answers Latest
Updated 2026




All NDE shall be performed in accordance to what standard?

API 650, Section 8 and any supplemental requirements of API 653, section 12




Personnel performing NDE shall be qualified in accordance with what standard?

API 650, Section 8 and any supplemental requirements of API 653, Section 12




Acceptance criteria for NDE shall be in accordance with what standard?

,API 650, Section 8 and any supplemental requirements of API 653, Section 12




Examiners performing NDE shall be Certified how?

Shall be a Level II according to ASNT-SNT-TC-1A




What examinations shall be performed on newly deposited weld metal or any cavity resulted by
grinding or gouging operations?

Shall be visually examined over its entire length, Additional NDE of those welds may be required
as described in relevant sections of API 653, Section 12.1




Annex G may be used to provide what additional guidance?

Annex G may be used to provide additional guidance in qualifying personnel and procedures
when magnetic flux leakage tools are used to examine tank bottoms. Owner/operators should
determine specific requirements to meet their tank bottom needs.




When may UT examination in accordance with API 650, Annex U, be used when RT is specified
for examination of welds?

May be used for RT with agreement between purchaser and manufacturer




When and where shall UT examination of shell plate for lamination be performed?

UT examination of shell plate shall be made in the immediate affected area when adding a
reinforcement plate to an existing unreinforced shell penetration and when adding a hot tap.

, How shall cavities resulting from gouging or grinding operations to remove attachment welds of
existing reinforcement plates?

Shall be examined by MT or PT




Complted welds attaching nozzle neck to shell, and reinforcement plate to shell and to nozzle
neck, shall require what NDE?

Shall be examined by MT or PT. Consider additional examination (e.g. WFMT and/or UT) for hat
tap connection onto shell plates of unknown toughness.




Completed welds of stress-relieved assemblies on shell penetrations shall require what NDE?

Shall be examined by MT or PT after stress relief, but before hydro.




Cavities resulting from grinding or gouging operations to remove weld defects shall require
what NDE?

Shall be examined using MT or PT




Completed weld repairs of butt welds shall be examined volumetrically how?

Shall be examined over the full length by RT or UT. However, for completed repairs to butt welds
found in shell plate to shell plate joints, the additional RT's, as required in 12.2.1.1.C, 12.2.1.2.C,
and 12.2.1.3.C, do not apply.




How shall weld repairs of fillet weld be examined?

Document information

Uploaded on
May 13, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LectDeniz
5.0
(1)
Sold
21
Followers
16
Items
5281
Last sold
10 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions