API 653 Closed Book Exam Master Guide: Aboveground Storage Tank (AST) Integrity Assessment, Inspection Intervals, Risk-Based Inspection (RBI), Storage Tank Engineer Responsibilities, API 650 Construction Compliance, API 579 Fitness-for-Service (FFS), Shel

Document preview thumbnail
Preview 3 out of 25 pages

API 653 Closed Book Exam Master Guide: Aboveground Storage Tank (AST) Integrity Assessment, Inspection Intervals, Risk-Based Inspection (RBI), Storage Tank Engineer Responsibilities, API 650 Construction Compliance, API 579 Fitness-for-Service (FFS), Shell-to-Bottom Weld Evaluation, Tank Bottom Corrosion Mechanisms, Cathodic Protection Systems, Release Prevention Systems (RPS), Internal Floating Roof Design, Hydrostatic Testing Requirements, Vacuum Box Testing Procedures, Radiographic Testing (RT), Ultrasonic Testing (UT), Magnetic Particle Inspection (MPI), Liquid Penetrant Testing (PT), Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welder Performance Qualification (WPQ), Controlled Deposition Welding, Post Weld Heat Treatment (PWHT), Lapped Patch Repair Design, Shell Distortion Analysis, Settlement Evaluation, Nozzle Installation and Reinforcement, Flange and Material Selection, Structural Integrity and Fatigue Analysis, Corrosion Rate Determination, Similar Service Method, Inspection Hold Points, API 2201 Hot Work Safety Exam Questions Verified and Provided with Complete A+ Graded Answers Latest Updated 2026 what is the minimum thickness for a tank floor plate with no means for leak detection or secondary containment if an RBI program is not in place 0.1 inch reference table 4.4 API 653 when a full hydrostatic test is required, it shall be held for 24-hours reference 12.3.1 API 653 how many radiographs shall be taken in a square 2 in x 24 in but welded insert play in a 1-inch thick shell 6 total one horizontal one vertical one in each corner : reference 12.2.1.6.2 API 653 what is the minimum number of radiographs that shall be taken on a circular but welded insert plate in a shell 1/2 in thick one : reference 12.2.16 .1 API 653 how much time do you need to keep the radiographs of a reconstructed tank 1 year reference 13.2.3 API 653 who should conduct visual inspection and review and NDE results? the authorized inspector how much time should the operator keep the cathodic protection records 5 years minimum diagnostic length of a radiograph is 6 inches the total metal lost / the period of time over which the metal loss occurred is the corrosion rate the presence of rock under the steel bottom of an AST would have what effect promote severe Underside corrosion when do you use thin-film linings when the tank is new or has light corrosion a formal visual external inspection by an authorized inspector shall be made at least every five years or RCA / 4N years whichever is less radiographic density shall be check by densitometer calibrated on a step wedge film traceable to a National Standard a welder deposits more metal than Allowed by the WPS what should be done re-qualify the welder what is the maximum critical length for plate thickness determination 40 inches when is it necessary for a hydrostatic test on a reconstructed tank always

Content preview

API 653 Closed Book Exam Master Guide: Aboveground Storage Tank (AST)
Integrity Assessment, Inspection Intervals, Risk-Based Inspection (RBI),
Storage Tank Engineer Responsibilities, API 650 Construction Compliance,
API 579 Fitness-for-Service (FFS), Shell-to-Bottom Weld Evaluation, Tank
Bottom Corrosion Mechanisms, Cathodic Protection Systems, Release
Prevention Systems (RPS), Internal Floating Roof Design, Hydrostatic
Testing Requirements, Vacuum Box Testing Procedures, Radiographic
Testing (RT), Ultrasonic Testing (UT), Magnetic Particle Inspection (MPI),
Liquid Penetrant Testing (PT), Welding Procedure Specification (WPS),
Procedure Qualification Record (PQR), Welder Performance Qualification
(WPQ), Controlled Deposition Welding, Post Weld Heat Treatment (PWHT),
Lapped Patch Repair Design, Shell Distortion Analysis, Settlement
Evaluation, Nozzle Installation and Reinforcement, Flange and Material
Selection, Structural Integrity and Fatigue Analysis, Corrosion Rate
Determination, Similar Service Method, Inspection Hold Points, API 2201
Hot Work Safety Exam Questions Verified and Provided with Complete A+
Graded Answers Latest Updated 2026




what is the minimum thickness for a tank floor plate with no means for leak detection or
secondary containment if an RBI program is not in place

0.1 inch reference table 4.4 API 653




when a full hydrostatic test is required, it shall be held for

24-hours reference 12.3.1 API 653

,how many radiographs shall be taken in a square 2 in x 24 in but welded insert play in a 1-inch
thick shell

6 total one horizontal one vertical one in each corner : reference 12.2.1.6.2 API 653




what is the minimum number of radiographs that shall be taken on a circular but welded insert
plate in a shell 1/2 in thick

one : reference 12.2.16 .1 API 653




how much time do you need to keep the radiographs of a reconstructed tank

1 year reference 13.2.3 API 653




who should conduct visual inspection and review and NDE results?

the authorized inspector




how much time should the operator keep the cathodic protection records

5 years




minimum diagnostic length of a radiograph is

6 inches




the total metal lost / the period of time over which the metal loss occurred is the

, corrosion rate




the presence of rock under the steel bottom of an AST would have what effect

promote severe Underside corrosion




when do you use thin-film linings

when the tank is new or has light corrosion




a formal visual external inspection by an authorized inspector shall be made

at least every five years or RCA / 4N years whichever is less




radiographic density shall be check by densitometer calibrated on a step wedge film traceable
to

a National Standard




a welder deposits more metal than Allowed by the WPS what should be done

re-qualify the welder




what is the maximum critical length for plate thickness determination

40 inches

Document information

Uploaded on
May 13, 2026
Number of pages
25
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LectDeniz
5.0
(1)
Sold
21
Followers
16
Items
5281
Last sold
10 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions