1. A construction manager is evaluating a project’s feasibility during
preconstruction. Which document is most critical for establishing the
project’s scope baseline?
A) Construction schedule
B) Project charter
C) CORRECT ANSWER: Project charter (Defines the scope,
objectives, and participants, serving as the formal scope baseline.)
D) Change order log
2. Under the CM at Risk (CMAR) delivery method, the CM’s
commitment to a guaranteed maximum price (GMP) typically occurs at
which phase?
A) After 100% construction documents are complete
,B) CORRECT ANSWER: When design is sufficiently complete (The
CM provides a GMP after design development or when scope is
defined enough to price, usually before full CDs.)
C) Before schematic design
D) Only after project closeout
3. During the bidding phase, a CM receives a bid that is 15% below the
engineer’s estimate. The best course of action is to:
A) Accept the bid immediately
B) CORRECT ANSWER: Review the bid for errors or omissions
(Unusually low bids often contain mistakes, scope gaps, or
unbalanced pricing; the CM must verify completeness.)
C) Reject the bid for being non-responsive
D) Increase the contingency fund
4. A CCM is developing a quality management plan (QMP). Which
element is required for compliance with ISO 9001 principles?
A) Only final inspection records
,B) CORRECT ANSWER: Process approach and continuous
improvement (ISO 9001 emphasizes process control, risk-based
thinking, and PDCA for continual improvement.)
C) Exclusively supplier warranties
D) Daily safety toolbox talks
5. On a fast-track project, the CM uses a rolling wave scheduling
technique. This means:
A) All activities are fixed at the start
B) CORRECT ANSWER: Near-term activities are detailed; long-term
activities remain high-level (Rolling wave planning provides detailed
schedules for immediate work and progressively elaborates future
phases.)
C) The schedule is never updated
D) Only critical path activities are scheduled
, 6. A subcontractor submits a change order request for additional
compensation due to differing site conditions. The contract references
the AIA A201. Who bears the burden of proof?
A) Owner
B) CM
C) CORRECT ANSWER: Subcontractor (The subcontractor must
prove the conditions were not reasonably foreseeable and materially
differ from contract documents.)
D) Designer
7. Which financial metric best tracks the value of work physically
completed against actual costs?
A) Planned Value (PV)
B) CORRECT ANSWER: Earned Value (EV) (EV measures work
completed in dollar terms, allowing cost and schedule variance
analysis.)
C) Actual Cost (AC)