Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

MASTER ELECTRICIAN ACTUAL EXAM TEST BANK FULL SOLUTION WITH TESTED QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 3 out of 19 pages

MASTER ELECTRICIAN ACTUAL EXAM TEST BANK FULL SOLUTION WITH TESTED QUESTIONS AND ANSWERS

Content preview

MASTER ELECTRICIAN ACTUAL EXAM TEST
BANK FULL SOLUTION WITH TESTED
QUESTIONS AND ANSWERS

●● Where a conductor is marked RHW-2 on the insulation what does the
"-2" represent?.
Answer: The conductor has a maximum operating temperate of 90
degrees C.


●● For a grounded electrical system supplied by a feeder or branch
circuit, the equipment grounding conductor shall be sized in accordance
with _____..
Answer: the overcurrent protective device


●● For lighting systems operating at 30-volts or less, the output circuits
of the power supply are to
be rated for NOT more than _____..
Answer: 25 amperes


●● Using the standard method of calculation, what is the demand, in
kW, on the ungrounded (line) service-entrance conductors of an
apartment complex that has thirty-five (35) electric ranges rated at 11.5
kW each?.
Answer: 50 kW

,●● Where a service riser is installed in a wet location and contains
THWN insulated conductors, the wiring method used _____..
Answer: is permitted to be electrical metallic tubing (EMT)


●● What is the MAXIMUM distance between supports for straight
horizontal runs of trade size 1½ in. threaded rigid metal conduit
(RMC)?.
Answer: 14 feet


●● Overcurrent protection of transformers, of 600 volts or less, is
required to be sized _____..
Answer: in accordance with Table 450.3(B)


●● A thermal barrier shall be required if the space between the resistors
and reactors, of 600 volts or less, and combustible material is LESS than
_____..
Answer: 12 inches


●● In movie theaters, all switches for controlling the emergency lighting
systems shall be located _____..
Answer: in the lobby

, ●● Where a 90 ampere, 240-volt, single-phase load is located 225 feet
from a panelboard and is supplied with size 3 AWG copper conductors,
determine the approximate voltage drop on the conductors. (K = 12.9).
Answer: 10 volts


●● Wiring methods associated with solar photovoltaic (PV) systems
shall not be installed within _____ of the roof decking or sheathing
except where directly below the roof surface covered by PV modules
and associated equipment..
Answer: 10 inches


●● All metallic switchgear rated for over 600 volts shall be provided
with a grounding busbar for the purpose of connecting the _____..
Answer: metallic shield of cables


●● Conductors tapped from a feeder and supplying the primary of a
transformer need not have overcurrent protection, where the length of
the tap conductors are not over 25 feet and have an ampacity of at
LEAST _____ of the rating of the overcurrent device protecting the
feeder conductors..
Answer: one-third


●● Electrical equipment such as switchboards, panelboards, industrial
control panels, and motor control centers, located in commercial and
industrial occupancies are required to be field marked to warn _____ of
potential electrical arc flash hazards..

Document information

Uploaded on
May 7, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
170
Followers
2
Items
56578
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions