• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Backflow Troubleshooting Exam Script Final Paper Questions Answers Comprehensive Study Resource

Document preview thumbnail
Preview 2 out of 6 pages

BACKFLOW TROUBLESHOOTING EXAM SCRIPT FINAL PAPER QUESTIONS ANSWERS COMPREHENSIVE STUDY RESOURCE

Content preview

BACKFLOW TROUBLESHOOTING EXAM
SCRIPT FINAL PAPER QUESTIONS
ANSWERS COMPREHENSIVE STUDY
RESOURCE

●● Well field testing the first check valve of a double check valve
assembly, water continues to flow from the site tube. How do you
proceed?
Answer: Observe reading on gauge (first step). Open high side of bleed
valve (second step).


●● While field testing the check valve of a spill resistant pressure
vacuum breaker, water continues to flow from the vent valve. What does
this imply?
Answer: Number 1 shut off valve is leaking.


●● While field testing the differential pressure relief valve opening point
of RP, it is found that the shut - off valve # 2 is leaking . How should the
temporary bypass hose be connected to compensate for the leak?
Answer: Test cock # 1 to test cock # 4


●● While field testing the second check valve of a reduced pressure
principle assembly, high side pressure is applied through test cock # 4
and the gage reading begins to increase. How do you proceed?

, Answer: Close the # 2 test cock.


●● While field testing the differential pressure relief valve opening point
of an RP, the high side control needle valve is open, and the low side
control needle valve is open 1/4 turn, however the reading on the gauge
will not lower to the relief valve opening point. What does this imply?
Answer: Number 2 shut off valve is leaking


●● What are acceptable field test readings for a properly operating
double check valve assembly?
Answer: Check valve number 1: 1.0 PSID and above/ check valve
number 2: 1.0 P ID and above


●● When testing an RP, upon closing the number 2 shut off valve and
the high and low side bleed valves, the gauge reading drops and
differential pressure relief valve begins to discharge. How do you
proceed?
Answer: Record the number 1 check valve is leaking and end the test.


●● While field testing the number 1 check valve of a DC, water
continues to flow from the site tube. What is most likely to be the cause
of this situation?
Answer: Shut off valve #1 one is leaking.

Document information

Uploaded on
May 4, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.1
(14)
Sold
199
Followers
1
Items
64173
Last sold
2 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions