• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 249 pages
Exam (elaborations)

Are Practice Management Exam 2026 Study Guide Comprehensive Questions Answers Graded A+

Document preview thumbnail
Preview 4 out of 249 pages

ARE PRACTICE MANAGEMENT EXAM 2026 STUDY GUIDE COMPREHENSIVE QUESTIONS ANSWERS GRADED A+

Content preview

ARE PRACTICE MANAGEMENT
EXAM 2026 STUDY GUIDE
COMPREHENSIVE QUESTIONS
ANSWERS GRADED A+

◉ ..Gross Domestic Product. Answer: is the sum total of all goods and
services produced in the nation.


◉ "Holding Out". Answer: A term applied to someone representing as
an architect without holding a license in that jurisdiction.


◉ "INSTRUMENTS OF SERVICE". Answer: are representations, in
any medium of expression now known or later developed, of the
tangible and intangible creative work performed by the Architect and the
Architect's consultants under their respective professional services
agreements. may include, without limitation, studies, surveys, models,
sketches, drawings, specifications, and other similar materials.


◉ "Preliminary 20 day Notice " from Subcontractor. Answer: Submitted
by any subcontractor or material supplier within 20 days of supplying
the labor or materials to the project in order to maintain their lien rights


◉ "THE PROJECT" according to AIA A201. Answer: The Project is the
total construction of which the Work performed under the Contract
Documents may be the whole or a part and which may include
construction by the Owner and by separate contractors.

,◉ "THE SPECIFICATIONS" according to AIA A201. Answer: are that
portion of the Contract Documents consisting
of the written requirements for materials, equipment, systems,
standards and workmanship for the Work, and performance of related
services.


◉ "THE WORK" according to AIA A201. Answer: means the
construction and services required by the
Contract Documents, whether completed or partially completed, and
includes all other labor, materials, equipment and services provided or to
be provided by the Contractor to fulfill the Contractor's obligations.


◉ 1 cubic yard = 27 cubic feet. Answer: What is cubic yard to cubic feet


◉ 2 Broad Issues of Law Impacting Architecture. Answer: 1. Party
Disputes: Occur when problems arise on a project.
2. Administrative Issues and Proceedings: Admin issues arise from
regulations developed to implement civil statutes and other legal
requirements.


◉ 2 Common claims against Architects. Answer: Negligence(Breach,
Cause, Duty, Damage)
Breach of Contract

,◉ 2 Reasons to be wary of heightened client standards. Answer: 1. New
standards may not be adequately defined in industry.
2. Some standards may not be insurable under typical E&O policies.


◉ 2 types of Violations Considered by Licensing Boards. Answer: 1.
Violations by untrained and unlicensed individuals
2. Violations by trained individuals


◉ 2 Ways of Obtaining Reciprocity. Answer: 1. "Comity" or
"Endorsement" - Accepting as a courtesy the qualifications for licensure
from another stat.
2. Registration Board accepts NCARB Certificate on it's own.


◉ 3 Business Models for Professional Services. Answer: Efficiency
Based
Experience Based
Expertise Based


◉ 3 Ways to Avoid Clams. Answer: Using Proper Contracts
Use Proper Communication
Use Proper Documentation


◉ 4 Common Characteristics of Architects. Answer: 1. Possesses
technical knowledge
2. Nurtured by collegian organizations

, 3. Advance ethical public values
4. Advance ethical values through client services


◉ 5 Standard Phases of Architect's Services to Client. Answer: 1. SD
(schematic design)
2. DD (design development)
3. CDs (construction documents)
4. Bidding Negotiations
5. Construction Administration


◉ 6 Canons of AIA Code of Ethics. Answer: Canon 1: General
Obligations
Canon 2: Obligations to the Public
Canon 3: Obligations to the Client
Canon 4: Obligations to the Profession
Canon 5: Obligations to Colleagues
Canon 6: Obligations to Environment


◉ 60 days. Answer: CA services required more than x days from date of
substantial completion or initial date of substantial completion.


◉ 7 days. Answer: Owner needs to give x days notice to terminate
contract with architect without cause

Document information

Uploaded on
May 4, 2026
Number of pages
249
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
190
Followers
2
Items
61132
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions