Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

ISM 3113 MIDTERM QUESTIONS AND VERIFIED ACCURATE ANSWERS

Document preview thumbnail
Preview 2 out of 5 pages

ISM 3113 MIDTERM QUESTIONS AND VERIFIED ACCURATE ANSWERS

Content preview

ISM 3113 MIDTERM QUESTIONS AND VERIFIED
ACCURATE ANSWERS


For understanding users' needs, use tried and tested user-centered _____. - Answers -
Methods

____ means easy to learn, effective to use and provide an enjoyable experience. -
Answers - Usability

Working in multidisciplinary teams includes different _____ and ways of seeing and
talking about things. - Answers - Perspectives

_____ is the degree to which a product is usable and accessible by as many people as
possible. - Answers - Accessibility

_____ is sending information back to the user about what has been done. - Answers -
Feedback

The best conceptual models are those that appear _____; the operations they support
being intuitive to use. - Answers - Obvious

Most _____ applications are actually based on well established conceptual models. -
Answers - Interface

Interface _____ are intended to provide familiar entities that enable people to readily
understand the underlying conceptual model and know what to do at an interface. -
Answers - Metaphores

A main benefit of developing a conceptual model that uses a(n) ______ style of
interaction is that it allows people to interact with a system in a way that is familiar to
them. - Answers - Conversational

__________ refers to how information is acquired from the environment via the
difference sense organs. - Answers - Perception

The term _____ refers to the reasons, or justifications, for a proposal. - Answers -
Business case

Systems development typically starts with a _____. - Answers - Systems request

_____ planning is the process of identifying long-term organizational goals, strategies,
and resources. - Answers - Strategic

, Strategic planning starts with a _____ that reflects a firm's vision, purpose, and values. -
Answers - Mission statement

_____ usually focus on long-term challenges and goals, the importance of a firm's
stakeholders, and a commitment to the firm's role as a corporate citizen. - Answers -
Mission statements

A _____ must be achieved to fulfill a company's mission. - Answers - Critical success
factor

The overall aim of a _____ is to avoid seeking goals that are unrealistic, unprofitable, or
unachievable. - Answers - SWOT (strengths, weaknesses, opportunities, and threats)
analysis

Hardware-based security controls include _____. - Answers - Biometric devices

_____ limitations result when a system that was designed for a specific hardware
configuration becomes obsolete when new hardware is introduced. - Answers -
Performance

_____ technology uses radio frequency identification (RFID) tags to identify and monitor
the movement of each individual product, from a factory floor to the retail checkout
counter. - Answers - EPC (electronic product code)

The three legs of a project triangle are _____, scope, and time. - Answers - Cost

Project planning, an activity of a project manager, _____. - Answers - Includes
identifying project tasks and estimating completion times and costs

A project _____ negotiates with users who might have conflicting requirements or want
changes that would require additional time or expense. - Answers - Coordinator

Project scheduling, an activity of a project manager, _____. - Answers - Involves
staffing, which includes selecting the project team and assigning specific tasks to team
members

Project monitoring, an activity of a project manager, _____. - Answers - Requires
guiding, supervising, and coordinating a project team's workload

Project reporting, an activity of a project manager, _____. - Answers - Includes
informing management, users, and the project team about the progress of a project

Effective project reporting requires _____. - Answers - Strong communication skills

A _____ involves breaking a project down into a series of smaller tasks. - Answers -
Work breakdown structure (WBS)

Document information

Uploaded on
April 29, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(361)
Sold
2139
Followers
1448
Items
58834
Last sold
23 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions