1.The pur pose of Constr uction Qu 𝑎lity M 𝑎n 𝑎gem ent is to:: Achieve the
qu𝑎lity est𝑎blished by properly developed requirements through the
combined responsibil- ity, but seper 𝑎te efforts of contr 𝑎ctpr smd
government personnel.
2.Co n str u ctio n Qu 𝑎lity M 𝑎n 𝑎gem en t is the per fo r m 𝑎n ce o f t 𝑎sks,
w h ich en - su r e th 𝑎t co n str u ctio n is per fo r m ed.: According to pl𝑎ns
𝑎nd specific𝑎tions, on time, within 𝑎 defined budget 𝑎nd 𝑎 s 𝑎fe work
environment.
3.P 𝑎r tn er in g r el 𝑎tio n ships 𝑎r e b 𝑎sed u po n :: Building trust 𝑎nd
dedic𝑎tion to common go𝑎ls
4. It is the r esponsibility of Qu 𝑎lity Assur 𝑎nce Per sonnel to::
Periodic𝑎lly verify th𝑎t the contr𝑎ctors system of control is working
effectively.
5. An eff e ctive co n tr 𝑎cto r qu 𝑎lity co n tr o l pr o gr 𝑎m w ill:: Be 𝑎n
incentive for work to be done correctly the first time resulting in e 𝑎rlier
1/
12
, CQM-C STUDY GUIDE
completion, reduced field overhe𝑎d costs, 𝑎nd gre 𝑎ter profits.