• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 59 pages
Exam (elaborations)

ICC U1 Underground Storage Tank (UST) Installer Exam Actual EXAM Questions and Correct Answers with EXPLANATIONS LATEST THIS YEAR

Document preview thumbnail
Preview 4 out of 59 pages

ICC U1 Underground Storage Tank (UST) Installer Exam Actual EXAM Questions and Correct Answers with EXPLANATIONS LATEST THIS YEAR

Content preview

ICC U1 Underground Storage Tank (UST) Installer

Exam Actual EXAM Questions and Correct Answers

with EXPLANATIONS LATEST THIS YEAR




1. Excavated materials that cannot be immediately

removed from the site should be safely stockpiled at least

_______ feet away from the edge of the tank excavation -

ANSWER-2




4. Common deficiencies that adversely affect the structural

integrity and coating of tanks include - ANSWER-A. use of

incorrect backfill material

,B. Inadequate or improper placement or compaction of

backfill materials

C. rocks of debris left in the excavation

D. Voids under the lower quadrant of the tank

E. Failure to prevent migration of backfill materials

F. All of the above

Answer F




55. If a product is used for ballast do not fill tank about

_______ percent ? - ANSWER-95




56. Water in a storage tank can promote internal

_____________ and degrade fuel quality. - ANSWER-

Corrosion

,57. Back fill material should be - ANSWER-A. Stagnate

B. A-Morph-is

C. Egregious

D. Free flowing

Answer D




58. Cover the bottom of the excavation with suitably

graded and properly placed back fill material to a depth of

at least _________ Foot/feet deep - ANSWER-A. 0.5 Foot

B. 1 foot

C. 1.5 Feet

D. 2 Feet

Answer B

, 59. What are the standard back fill materials for a

fiberglass tank. - ANSWER-A. pea gravel and crushed

rock

B. pea gravel and dirt

C. pea gravel and water

D. sawdust and pea gravel

Answer A




60. When dealing with a fiberglass tank the bottom of the

excavation or hold-down pad must be covered with a

minimum of ______ foot/ feet of suitably graded and

compacted back fill material. - ANSWER-A. 10

B. 3

Document information

Uploaded on
April 27, 2026
Number of pages
59
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamPoint
4.0
(5)
Sold
32
Followers
1
Items
2557
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions