Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 50 pages
Exam (elaborations)

EICA MOBILE CRANE & DIGGER DERRICK Study Guide Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!!

Document preview thumbnail
Preview 4 out of 50 pages

EICA MOBILE CRANE & DIGGER DERRICK Study Guide Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!! 1. If not overloaded, the ground bearing pressure of a single outrigger pad can approach a weight equal to which of the following? A. 50% of crane weight and 50% of suspended load B. 75% of crane weight and 75% of suspended load C. 85% of the weight of the crane and 100% of the suspended load D. 100% of crane weight only Correct Answer: C. 85% of the weight of the crane and 100% of the suspended load 2. If you move a crawler crane from soft ground to harder ground, the ground bearing pressure will: A. Decrease B. Stay the same C. Increase D. Be eliminated Correct Answer: C. Increase 3. On a crawler crane, ground bearing pressure is greatest when hoisting: A. Over the side B. Over the front C. Over the rear D. Over the corner Correct Answer: D. Over the corner 4. An outrigger pad has 45,000 pounds applied and measures 2 ft × 2 ft. How many PSI are applied to the ground? A. 45 PSI B. 56 PSI C. 78 PSI D. 112 PSI Correct Answer: C. 78 PSI 5. How much area is required for 45,000 pounds to create only 20 PSI? A. 1,250 square inches B. 2,250 square inches C. 3,500 square inches D. 4,000 square inches Correct Answer: B. 2,250 square inches 6. Why are mats or cribbing used during crane setup? A. Increase crane speed B. Reduce ground bearing pressure C. Increase lifting capacity D. Improve swing radius Correct Answer: B. Reduce ground bearing pressure 7. What is the purpose of placing blocking or pads under outrigger floats? A. Increase boom height B. Stabilize counterweight C. Distribute the force over a larger area D. Reduce load weight Correct Answer: C. Distribute the force over a larger area 8. While swinging a heavy load over an outrigger, that outrigger must be able to support: A. 50% crane weight only B. 75% crane weight and 50% load C. 85% crane weight and 100% load weight D. 100% crane weight only Correct Answer: C. 85% crane weight and 100% load weight 9. What is the first action before traveling under a low pipe rack or obstruction? A. Lower the boom B. Increase speed C. Post a signalperson to check clearances D. Swing counterweight outward Correct Answer: C. Post a signalperson to check clearances 10. According to OSHA, when traveling under energized power lines over 750 kV, the minimum clearance is: A. 10 ft B. 15 ft C. 20 ft D. 45 ft Correct Answer: C. 20 f

Content preview

EICA MOBILE CRANE & DIGGER DERRICK

Study Guide Comprehensive Resource To Help You Ace
2026-2027 Exams Includes Frequently Tested Questions
With ELABORATED 100% Correct COMPLETE SOLUTIONS
Guaranteed Pass First Attempt!! Current Update!!



1. If not overloaded, the ground bearing pressure of a single outrigger pad can
approach a weight equal to which of the following?
A. 50% of crane weight and 50% of suspended load
B. 75% of crane weight and 75% of suspended load
C. 85% of the weight of the crane and 100% of the suspended load
D. 100% of crane weight only
Correct Answer: C. 85% of the weight of the crane and 100% of the
suspended load
2. If you move a crawler crane from soft ground to harder ground, the ground
bearing pressure will:
A. Decrease
B. Stay the same
C. Increase
D. Be eliminated
Correct Answer: C. Increase
3. On a crawler crane, ground bearing pressure is greatest when hoisting:
A. Over the side
B. Over the front
C. Over the rear
D. Over the corner
Correct Answer: D. Over the corner

4. An outrigger pad has 45,000 pounds applied and measures 2 ft × 2 ft. How
many PSI are applied to the ground?

, A. 45 PSI
B. 56 PSI
C. 78 PSI
D. 112 PSI
Correct Answer: C. 78 PSI
5. How much area is required for 45,000 pounds to create only 20 PSI?
A. 1,250 square inches
B. 2,250 square inches
C. 3,500 square inches
D. 4,000 square inches
Correct Answer: B. 2,250 square inches

6. Why are mats or cribbing used during crane setup?
A. Increase crane speed
B. Reduce ground bearing pressure
C. Increase lifting capacity
D. Improve swing radius
Correct Answer: B. Reduce ground bearing pressure
7. What is the purpose of placing blocking or pads under outrigger floats?
A. Increase boom height
B. Stabilize counterweight
C. Distribute the force over a larger area
D. Reduce load weight
Correct Answer: C. Distribute the force over a larger area
8. While swinging a heavy load over an outrigger, that outrigger must be able
to support:
A. 50% crane weight only
B. 75% crane weight and 50% load
C. 85% crane weight and 100% load weight
D. 100% crane weight only
Correct Answer: C. 85% crane weight and 100% load weight

,9. What is the first action before traveling under a low pipe rack or
obstruction?
A. Lower the boom
B. Increase speed
C. Post a signalperson to check clearances
D. Swing counterweight outward
Correct Answer: C. Post a signalperson to check clearances
10.According to OSHA, when traveling under energized power lines over 750
kV, the minimum clearance is:
A. 10 ft
B. 15 ft
C. 20 ft
D. 45 ft
Correct Answer: C. 20 ft
11.When passing under 50 kV power lines with a crane in transit, OSHA
minimum clearance is:
A. 4 ft
B. 6 ft
C. 10 ft
D. 20 ft
Correct Answer: B. 6 ft

12.When setting up near a ditch or excavation, the crane should be positioned
at least:
A. Half the depth away
B. Equal to the depth away
C. 1½ times the depth of the excavation
D. Two times the depth
Correct Answer: C. 1½ times the depth of the excavation
13.When working near a cellar wall, outrigger pads should be placed:
A. Directly beside the wall

, B. Half the wall depth away
C. At least as far back as the depth of the wall below ground
D. On top of the wall footing
Correct Answer: C. At least as far back as the depth of the wall below
ground
14.According to OSHA, who is responsible for ensuring proper ground
conditions for a mobile crane?
A. Operator
B. Signalperson
C. The controlling entity
D. Rigger
Correct Answer: C. The controlling entity

15.Which of the following is NOT a good location for crane setup?
A. Compacted soil
B. Level gravel surface
C. Above utilities
D. Crane mat surface
Correct Answer: C. Above utilities
16.When underground utilities may be present, the best procedure is to:
A. Proceed carefully
B. Reduce load weight
C. Contact local utility company
D. Use smaller crane
Correct Answer: C. Contact local utility company
17.During shift inspection, water accumulation around an outrigger must be:
A. Ignored
B. Covered
C. Drained
D. Measured
Correct Answer: C. Drained

Document information

Uploaded on
April 26, 2026
Number of pages
50
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
279
Followers
87
Items
3228
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions